27 Goldington Drive Bongate Cross Appleby-in-westmorland CA16 6FE Data via plota.co.uk

2026/1890/HOU - Householder Consultation Started

Proposal

Two story rear extension to provide additional living accommodation. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
28 Sept 2026
✓
Validated
2 Nov 2026
Decision
Expected by 28 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 29 Dec 2026 and 11 Jan 2027, from Westmorland and Furness's recent extensions.

Comments are open until 25 Nov 2026

Comment on this application ↗

Site constraints 12

Nutrient neutrality catchment: River Eden SAC
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Special area of conservation 263 m away: River Eden
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Also on the record
SSSI 263 m away: Town End Meadows, Little Asby SSSI; National infrastructure project 1.3 km away: A66 Northern Trans-Pennine Project; Nature recovery project: East of Eden; Radon affected area, class 3; Scheduled monument 202 m away: St Michael's Church, Bongate; 2 listed buildings within 150 m; Conservation area 66 m away: Appleby; Heritage at risk 66 m away: Appleby, Appleby; Inside the Appleby-in-Westmorland built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 4 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 2

Last sold for £238,000 in February 2020. Detached house, freehold.

7 February 2020£238,000
4 April 2016£229,950New build

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area94 m² (1,012 sq ft)
Energy ratingC (80 out of 100), could reach A
PropertyDetached house
Built2012
HeatingBoiler and radiators, mains gas
WallsAverage thermal transmittance 0.28 W/m²K

From the energy performance certificate lodged in March 2016, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in Westmorland and Furness - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Householder
Postcode
CA16 6FE
Received
28 Sept 2026
Validated
2 Nov 2026
Ward
Appleby and Brough
Parish
Appleby-in-Westmorland
Case officer
Show
Decision level
Delegated
Applicant
Show
Agent
Alastair Davis

Decision outlook

Day 21 of the 56-day target. Westmorland and Furness usually decides extensions by day 61.

Day 2140 days to the predicted decision (day 61)
39%decided within 8 weeks
94%approved
402decided in the last year

Plota live figures for extensions decided by Westmorland and Furness in the last twelve months, from validation. Westmorland and Furness decision record →

Consultation & key dates

Consultation
4 Nov 2026
Comments by
25 Nov 2026
Statutory expiry
28 Dec 2026
Westmorland and Furness
Planning Authority Score
3.1/10
Poor
#233 of 296 overall
Relevant to this application:
Householder decisions

Westmorland and Furness is slower than most councils at deciding householder applications: #235 of 296 on speed. 52% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Westmorland and Furness decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #96 of 296
93%
Householder approved
Above avg (90%) #145 of 296
51%
Decided in 8 weeks
Below avg (63%) #235 of 296
52%
Extended time limit
Above avg (41%) #238 of 296
84%
Minor dwellings approved
69 decided (1-9 homes)
100%
Major dwellings approved
18 decided (10+ homes)
89%
Change of use approved
135 decided
1,204
Total decisions
91 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.