Hilton House Hotel, Mill Lane, Hilton, Derby, DE65 5GP Data via plota.co.uk

DMOT/2025/1696 Approved

Proposal

The pruning of a Beech and Cedar Tree covered by South Derbyshire District Council Tree Preservation Order no. 161 Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
19 Dec 2025
✓
Approved
13 Feb 2026

Approved on 13 Feb 2026 · Delegated Decision · Last checked 21 Oct 2026

Site constraints 4

Public footpath about 11 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Also on the record
National infrastructure project about 1.9 km away: Willington C Gas Pipeline; Inside the Hilton (South Derbyshire) built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 4, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 1 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in South Derbyshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Postcode
DE65 5GP
Received
19 Dec 2025
Validated
19 Dec 2025
Case officer
Show
Target decision
13 Feb 2026
Decision
Approve with Conditions
Decision date
13 Feb 2026
Decision level
Delegated Decision

How this decision compares

Decided in 56 days from validation, 22 days faster than South Derbyshire's median of 78 for full applications. Approved, as 94% of full applications here are.

12%decided within 8 weeks
94%approved
213decided in the last year

Plota live figures for full applications decided by South Derbyshire in the last twelve months, from validation. South Derbyshire decision record →

Consultation & key dates

Consultation
8 Jan 2026
Comments by
29 Jan 2026
South Derbyshire
Planning Authority Score
6.1/10
Average
#101 of 296 overall
Relevant to this application:
Householder decisions

South Derbyshire is #177 of 296 councils on householder decision speed. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
South Derbyshire decision statistics
Based on MHCLG data, the year to March 2026
94%
Overall approval rate
Above avg (87%) #46 of 296
97%
Householder approved
Above avg (90%) #42 of 296
61%
Decided in 8 weeks
Below avg (63%) #177 of 296
38%
Extended time limit
Below avg (41%) #132 of 296
88%
Minor dwellings approved
86 decided (1-9 homes)
89%
Major dwellings approved
19 decided (10+ homes)
97%
Change of use approved
29 decided
605
Total decisions
34 refused in the year to March 2026