13 - 19 The Green Southall UB2 4AH Data via plota.co.uk
Proposal
Details of a refuse management plan pursuant to condition 39 of planning permission Ref: dated 13.03.2025 'Construction of 23 storey building, with a basement level, to be used as student accommodation (Use Class Sui Generis), provision of associated cycle storage, refuse storage facilities, amenity space, public realm, landscaping and associated works.' Data via plota.co.uk
Application progress
Under consideration
No decision has been issued yet. A decision is expected by 1 Sept 2026.
Documents 2
Application forms 1
Associated applications 11
- ConditionsDetails of a refuse management plan pursuant to condition 39 of planning permission Ref…This application262689CND
Show 9 more · 6 approved, 3 pending
Show 6 earlier · 6 approved
Site constraints 6
Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.
Every application in Ealing - and every UK council - as a live feed, an API, or a bulk CSV export.
Other new applications on this street
St Anselms Rc Church The Green Southall UB2 4BE
Installation of fence with manual sliding gate; installation of pedestrian gate ...
13 The Green Southall UB2 4AH
Application for non-material amendment to planning permission reference 243547FU...
52 The Green Southall UB2 4BQ
Construction of a mixed-use six-storey building comprising of Housing in Multipl...
Nearby new applications
133 Trinity Road Southall UB1 1ES
Rear roof extension, and installation of three roof lights to front roofslope (L...
133 Trinity Road Southall UB1 1ES
Single storey (Max 5.95m deep and Max 2.95m high) rear extension (42 days Prior ...
32 King Street Southall UB2 4DB
Submission of an enhanced sound insulation of at least 10dB above the Building R...
1 Milan Road Southall UB1 3HD
T345-Lombardy poplar (19.5 mH) Reduce upper canopy by approximately 3 metres to ...
19-21 Western Road Southall Ealing UB2 5JL
TPO 057. T1, T2 and T3 - Prunus spp. (Cherry trees) Proposed works comprise the ...
32 King Street Southall UB2 4DB
Details of a filtered fresh air ventilation system and equipment assessment purs...
Important details
Public comments
No public comments yet.
Last counted 8 Oct 2026
Consultation & key dates
- Alt. reference
- PP-15066791
- Planning Portal ref
- PP-15066791
- Consultation
- 28 Jul 2026
- Comments by
- 11 Aug 2026
- Statutory expiry
- 1 Sept 2026
- Env. assessment
- No
Historical activity at this location
28 previous applications on record - archival context, not part of the live application.
Previous applications at this address
Nearby activity
Ealing is slower than most councils at deciding householder applications, ranking #264 out of 296. The council extends the time limit on 61% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).
Track this application
13 - 19 The Green Southall UB2 4AH
Tracking this application
Not there in a minute? Check junk - especially Hotmail and Outlook.
Go to your dashboard →Sign in to view contact details
Applicant and case-officer names are hidden from public view for privacy. Create a free Plota account - or sign back in - and we'll show them, plus you get a dashboard for alerts and tracked applications.
Check your email
Referenced application
Council archive
13 - 19 The Green Southall UB2 4AH
Construction of 23 storey building, with a basement level, to be used as student accommodation (Use Class Sui Generis), provision of associated cycle storage, refuse storage facilities, amenity space, public realm, landscaping and associated works.
- Received
- 10 Sep 2024
- Decided
- 10 Feb 2025
- Outcome
- Approved

The consultation period closed on 11 Aug 2026.