Former Courtauld’s Security Hut, Greenfield Dock, Greenfield CH8 7GJ Data via plota.co.uk

FUL/000748/26 - Full - Building Works Publication period closed

Proposal

Change of use of vacant building creating a small cafe serving hot/cold drinks and light refreshments, including a kitchen, servery and limited internal seating. Proposed small single-storey side extension to provide externally accessed accessible WC and external works including paving to provide level access and a small area of external seating Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
4 Sept 2026
✓
Consultation
21 Oct 2026
Decision
Expected by 10 Dec 2026

Under consideration

No decision has been issued yet. Plota predicted a decision soon after comments close on 5 Nov 2026; it is now day 80.

The consultation period closed on 5 Nov 2026.

Site constraints 13

Coal mining legacy areaDevelopment Control North TeamCounty Boundary Flintshire Unitary Authority County BoundaryWindfarm Consultation Area Consult National Air Traffic Services.Existing Waste Management Site Consult Environmental HealthLandfillFlood Map Seas Flood Zone 3
Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Ramsar wetland 24 m away: The Dee Estuary (Wales)
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
SSSI 24 m away: Dee Estuary / Aber Afon Dyfrdwy
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
National infrastructure project 472 m away: Connah’s Quay Low Carbon Power Project
The site is 472 m from the project boundary. Generating station, awaiting the Secretary of State's decision.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Radon affected area, class 6
An estimated 30% or more of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Coal mining legacy areaCouncil record
Recorded by the council for this site.
Council site ↗
Development Control North TeamCouncil record
Recorded by the council for this site.
Council site ↗
County Boundary Flintshire Unitary Authority County BoundaryCouncil record
Recorded by the council for this site.
Council site ↗
Windfarm Consultation Area Consult National Air Traffic Services.Council record
Recorded by the council for this site.
Council site ↗
Existing Waste Management Site Consult Environmental HealthCouncil record
Recorded by the council for this site.
Council site ↗
LandfillCouncil record
Recorded by the council for this site.
Council site ↗
Flood Map Seas Flood Zone 3Council record
Recorded by the council for this site.
Council site ↗
Also on the record
Coalfield, development low risk area.
Not affected
No listed building at the site · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Flintshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Flintshire
Application type
Full - Building Works
Postcode
CH8 7GJ
Received
4 Sept 2026
Validated
4 Sept 2026
Ward
Flintshire Ward Greenfield
Parish
Flintshire Community Holywell Town Council
Case officer
Show
Target decision
10 Dec 2026
Applicant
Show
Agent
Saer Architects

Decision outlook

Day 80, past the statutory target. 86% of changes of use in Flintshire are decided within thirteen weeks, which runs to 4 Dec 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 22 Nov 2026.

Day 8024 days past the 56-day target
66%decided within 8 weeks
78%approved
78decided in the last year

Plota live figures for changes of use decided by Flintshire in the last twelve months, from validation. Flintshire decision record →

Consultation & key dates

Alt. reference
PP-15165219
Comments by
5 Nov 2026
Site or press notice
15 Oct 2026