Land South of Hall Park Burneside KENDAL LA9 6QF Data via plota.co.uk

2026/1838/SCREEN - Screening Opinion Valid

Proposal

Request for a screening opinion under the Town and Country Planning (Environment Impact Assessment) Regulations 2017 for the erection of up to 195 dwellings Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
2 Sept 2026
Decision
Expected by 28 Oct 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 28 Oct 2026 and 14 Nov 2026, from Westmorland and Furness's recent new homes.

Site constraints 7

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Special area of conservation about 112 m away: River Kent
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
SSSI about 112 m away: River Kent and Tributaries SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Also on the record
Radon affected area, class 2; Inside the Burneside built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Westmorland and Furness - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Screening Opinion
Postcode
LA9 6QF
Received
2 Sept 2026
Validated
2 Sept 2026
Ward
Upper Kent
Parish
Burneside (Strickland Roger)
Case officer
Show
Decision level
Delegated
Applicant
Show
Agent
McDonald Wilkinson Tonge

Decision outlook

Day 37 of the 56-day target. Westmorland and Furness usually decides new homes by day 66.

Day 3729 days to the predicted decision (day 66)
45%decided within 8 weeks
78%approved
60decided in the last year

Plota live figures for new homes decided by Westmorland and Furness in the last twelve months, from validation. Westmorland and Furness decision record →

Consultation & key dates

Statutory expiry
5 Oct 2026
Westmorland and Furness
Planning Authority Score
3.1/10
Poor
#233 of 296 councils
Relevant to this application:
Major dwellings

Westmorland and Furness is slower than most councils at deciding householder applications, ranking #235 out of 296. 52% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Westmorland and Furness decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #96 of 296
93%
Householder approved
Above avg (90%) #145 of 296
51%
Decided in 8 weeks
Below avg (63%) #235 of 296
52%
Extended time limit
Above avg (41%) #238 of 296
84%
Minor dwellings approved
69 decided (1-9 homes)
100%
Major dwellings approved
18 decided (10+ homes)
89%
Change of use approved
135 decided
1,204
Total decisions
91 refused in the year to March 2026