National Grid Electricity Distribution South Wales Dowlais Grid Substation Pengarnddu Dowlais Merthyr Tydfil Data via plota.co.uk

P/26/0189 - Full Unknown

Proposal

Removal of the existing tower and installation of new tower with new antennas and transmission dishes, emergency back up generator, cable gantry, feeder cables and associated access track, etc. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
25 Aug 2026
✓
Consultation
2 Sept 2026
Decision
Expected by 20 Oct 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 10 Oct 2026 and 17 Oct 2026, from Merthyr Tydfil's recent full applications.

The consultation period closed on 23 Sept 2026.

Site constraints 5

Agricultural land, grade 4
Poor quality farmland, not best and most versatile. Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Also on the record
Radon affected area, class 4; 1 listed building within 150 m; SSSI 410 m away: Mynyddoedd Llangynidr a Llangatwg, Cefn yr Ystrad a Chomin Merthyr; Coalfield, development low risk area.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Merthyr Tydfil - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full
Received
25 Aug 2026
Validated
25 Aug 2026
Ward
DOWLAIS
Case officer
Show
Applicant
Show

Decision outlook

Day 45 of the 56-day target. Merthyr Tydfil usually decides full applications by day 51.

Day 4511 days to the 56-day target
67%decided within 8 weeks
87%approved
6%go to committee

Plota live figures for full applications decided by Merthyr Tydfil in the last twelve months, from validation. Merthyr Tydfil decision record →

Public comments

No public comments yet.

4 neighbours consulted · Last counted 6 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Neighbours
2 Sept 2026
Consultation
2 Sept 2026
Comments by
23 Sept 2026
Env. assessment
No