116-118, Lower Lichfield Street, Willenhall, WV13 1PU Data via plota.co.uk

25/0755 - Full Application Refused

Proposal

Full planning application for a proposed conversion of ground floor rear of existing shops and first and second floors (planning use Class E) into 12 x 1 bed HMO (planning use Class Sui Generis), demolition of single storey rear storage building and new door in existing wall from Upper Lichfield Street plus retrospective permission for new shop fronts. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
2 Sept 2025
✗
Refused
26 Jun 2026
Appeal
Appeal lodged

Refused on 26 Jun 2026 · Last checked 21 Nov 2026

Planning committee

Decided by Walsall Planning Committee on 18 Jun 2026.

Refused by 5 votes to 2

Against officer advice: officers had recommended approval.

  • Officers advised approval because the proposal would provide housing in a sustainable brownfield district-centre location, subject to conditions.
  • Objectors raised concerns about HMO oversaturation, noise, crime, safeguarding, parking, waste and effects on neighbouring businesses.
  • The committee voted to refuse permission, citing HMO oversaturation, community imbalance and effects on the area’s character.
Read how the committee decided The proposal, site history, officer assessment, objections, speakers, committee debate, vote and reasons for refusal.

Source: Plota analysis of Walsall's committee minutes of 18 Jun 2026.

Site constraints 8

Coal mining development high risk area
Recorded coal mining features at or near the surface. Most planning applications here need a coal mining risk assessment.
From the Mining Remediation Authority, formerly the Coal Authority. The development high risk area marks recorded coal mining features at or near the surface: mine shafts and adits, shallow workings, mine gas and former opencast sites. Most planning applications there need a coal mining risk assessment; householder applications, changes of use and some minor works are exempt. Mine entry positions come from old plans and can be out by several metres, and unrecorded workings can exist anywhere in the coalfield.
Coal mining risk assessments ↗
Willenhall conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Air quality management area: Walsall AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Public footpath about 21 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
9 listed buildings within 150 m of the postcode pin
Nearest: 33, Market Place, Grade II, about 55 m from the postcode pin · 9 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 9 with distances
Historic England ↗
Also on the record
Radon affected area, class 4; Nature improvement area: Birmingham and the Black Country; Inside the Willenhall built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Walsall - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Walsall
Application type
Full Application
Postcode
WV13 1PU
Received
2 Sept 2025
Validated
2 Sept 2025
Ward
Willenhall
Case officer
Show
Target decision
28 Oct 2025
Decision
Refuse Permission
Decision date
26 Jun 2026
Applicant
Show
Agent
Anjum Mehmood

How this decision compares

Decided in 297 days from validation, 190 days slower than Walsall's median of 107 for full applications. Refused, as 22% of full applications here are.

16%decided within 8 weeks
78%approved
193decided in the last year

Plota live figures for full applications decided by Walsall in the last twelve months, from validation. Walsall decision record →

Consultation & key dates

Consultation
18 Sept 2025
Comments by
2 Oct 2025
Committee
18 Jun 2026
Walsall
Planning Authority Score
2.1/10
Poor
#271 of 296 overall
Relevant to this application:
Change of use

Walsall is slower than most councils at deciding householder applications: #228 of 296 on speed. The council extends the time limit on 56% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (89%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Walsall decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #230 of 296
89%
Householder approved
Below avg (90%) #213 of 296
52%
Decided in 8 weeks
Below avg (63%) #228 of 296
56%
Extended time limit
Above avg (41%) #257 of 296
66%
Minor dwellings approved
95 decided (1-9 homes)
75%
Major dwellings approved
4 decided (10+ homes)
60%
Change of use approved
48 decided
800
Total decisions
128 refused in the year to March 2026