25/00292/PAAD - Prior Approval Application Demolition Approved

Proposal

The Pod, St Andrew's Quay, Hull, HU3 4SA (Application to determine whether prior approval is required for the method of demolition and the reinstatement of the site) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
20 Mar 2025
✓
Approved
17 Jul 2025

Approved on 17 Jul 2025 · Delegated Decision · Last checked 18 Oct 2026

Site constraints 10

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Special area of conservation 31 m away: Humber Estuary
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
SSSI 30 m away: Humber Estuary - 2000480 SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
National infrastructure project 667 m away: A63 Castle Street Improvement-Hull
The site is 667 m from the project boundary. Highway, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Public footpath 29 m away; Humber Bridge to Easington 25 m away; Flood defence 24 m away (wall); Inside the Kingston upon Hull built-up area; Priority habitat 37 m away: Mudflats.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 1 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area172 m² (1,851 sq ft)
Energy ratingC (asset rating 62)
UseA3/A4/A5 Restaurant and Cafes/Drinking Establishments and Hot Food takeaways
HeatingAir Conditioning

From the energy performance certificate lodged in July 2021, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Hull - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Hull
Application type
Prior Approval Application Demolition
Postcode
HU3 4SA
Received
20 Mar 2025
Validated
20 Mar 2025
Ward
St Andrews And Dockland
Case officer
Show
Decision
Prior Approval Demolition Approved
Decision date
17 Jul 2025
Decision level
Delegated Decision
Agent
Planning and Design Group (UK) Ltd
Leaseholder
Show

How this decision compares

Decided in 119 days from validation, 83 days slower than Hull's median of 36 for prior approvals. Approved, as 84% of prior approvals here are.

79%decided within 8 weeks
84%approved
102decided in the last year

Plota live figures for prior approvals decided by Hull in the last twelve months, from validation. Hull decision record →

Public comments

No public comments yet.

Last counted 18 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-13873963
Planning Portal ref
PP-13873963
Comments by
8 Jul 2025
Env. assessment
No
Hull
Planning Authority Score
2.6/10
Poor
#248 of 296 overall
Relevant to this application:
Householder decisions

Hull is slower than most councils at deciding householder applications: #231 of 296 on speed. The council extends the time limit on 62% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Hull decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #85 of 296
92%
Householder approved
Above avg (90%) #156 of 296
51%
Decided in 8 weeks
Below avg (63%) #231 of 296
62%
Extended time limit
Above avg (41%) #273 of 296
88%
Minor dwellings approved
16 decided (1-9 homes)
86%
Major dwellings approved
14 decided (10+ homes)
88%
Change of use approved
33 decided
436
Total decisions
36 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.

Leaseholders: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.