48 Cavendish Street Chichester West Sussex PO19 3BS Data via plota.co.uk

26/01704/LBC - Listed Building Consent Pending Consideration

Proposal

Proposed replacement and enlargement of basement window. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
31 Jul 2026
✓
Validated
28 Sept 2026
✓
Consultation
2 Oct 2026
Decision
Expected by 23 Nov 2026

This application is under consideration - no decision has been issued yet. Plota predicts a decision around 19 Nov 2026, from Chichester's recent extensions.

Site constraints 4

33 listed buildings within 150 m of the postcode pin
Nearest: 40-43, Cavendish Street, Grade II, about 12 m from the postcode pin · 33 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 33 with distances
Historic England ↗
Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Chichester conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Also on the record
Inside the Chichester built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 3 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Chichester - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Chichester
Application type
Listed Building Consent
Postcode
PO19 3BS
Received
31 Jul 2026
Validated
28 Sept 2026
Ward
Chichester West
Parish
Chichester
Case officer
Show
Target decision
23 Nov 2026
Decision level
Delegated
Applicant
Show

Decision outlook

Day 7 of the 56-day target. Chichester usually decides extensions by day 52.

Day 749 days to the 56-day target
88%decided within 8 weeks
93%approved
434decided in the last year

Plota live figures for extensions decided by Chichester in the last twelve months, from validation. Chichester decision record →

Public comments

No public comments yet.

Last counted 3 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15095033
Consultation
2 Oct 2026
Statutory expiry
23 Nov 2026
Env. assessment
No
Chichester
Planning Authority Score
8.9/10
Excellent
#6 of 296 councils
Relevant to this application:
Other decisions

Chichester is one of the fastest councils in England for householder decisions, ranking #10 out of 296. Only 18% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Chichester decision statistics
Based on MHCLG data, the year to March 2026
89%
Overall approval rate
Above avg (87%) #127 of 296
95%
Householder approved
Above avg (90%) #72 of 296
93%
Decided in 8 weeks
Above avg (63%) #10 of 296
18%
Extended time limit
Below avg (41%) #15 of 296
68%
Minor dwellings approved
110 decided (1-9 homes)
76%
Major dwellings approved
17 decided (10+ homes)
74%
Change of use approved
34 decided
935
Total decisions
107 refused in the year to March 2026