Plymleigh Service Station Plymouth Road Plymouth PL3 6EE Data via plota.co.uk

26/00817/ADV - Advertisement Consent Approved

Proposal

Erection of a D6 small format advertisement display Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
9 Jun 2026
✓
Approved
23 Jul 2026

Approved on 23 Jul 2026 · Delegated Decision · Last checked 24 Jul 2026

Site constraints 9

Article 4 direction
HMOs Mutley, Greenbank, City Centre and surrounding areas. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Scheduled monument 85 m away: Laira Emplacement, immediately south west of Laira Battery
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Local nature reserve 312 m away: Efford Marshes
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Also on the record
Radon affected area, class 4; Tree preservation order 4 m away: 924; Inside the Plymouth built-up area; Heritage at risk 85 m away: Laira Emplacement, immediately south west of Laira Battery.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Plymouth - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Plymouth
Application type
Advertisement Consent
Postcode
PL3 6EE
Received
9 Jun 2026
Validated
9 Jun 2026
Ward
EFFORD AND LIPSON
Case officer
Show
Target decision
4 Aug 2026
Decision
Grant Conditionally
Decision date
23 Jul 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Alder King Planning Consultants

How this decision compares

Decided in 44 days from validation, 6 days faster than Plymouth's median of 50 for signs and adverts. Approved, as 93% of signs and adverts here are.

78%decided within 8 weeks
93%approved
51decided in the last year

Plota live figures for signs and adverts decided by Plymouth in the last twelve months, from validation. Plymouth decision record →

Consultation & key dates

Statutory expiry
4 Aug 2026
Env. assessment
No
Plymouth
Planning Authority Score
7/10
Good
#63 of 296 councils
Relevant to this application:
Other decisions

Plymouth is faster than most councils at deciding householder applications, ranking #86 out of 296. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Plymouth decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #64 of 296
94%
Householder approved
Above avg (90%) #114 of 296
74%
Decided in 8 weeks
Above avg (63%) #86 of 296
32%
Extended time limit
Below avg (41%) #67 of 296
88%
Minor dwellings approved
48 decided (1-9 homes)
100%
Major dwellings approved
8 decided (10+ homes)
87%
Change of use approved
46 decided
680
Total decisions
50 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use