Certificate of Lawfulness for installation of electric vehicle charging points, comprising chargepoint upstands, supporting electrical equipment, including a substation and cabinet infrastructure. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
3 Nov 2026
✓
Validated
4 Nov 2026
Decision
Expected by 30 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 7 Jan 2027 and 1 Feb 2027, from Hackney's recent utility and infrastructure works.

Site constraints 13

3 Article 4 directions
Whole of the London Borough of Hackney · Exemption Area (part 1) · Hackney Central Activity Zone. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Archaeological priority area: Hackney APA 2.11 Shoreditch
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Hackney AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: Shoreditch
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
Conservation area about 15 m away: Bunhill Fields and Finsbury Square
The edge of the area; work outside it can still affect its setting.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Heritage at risk about 15 m away: Bunhill Fields, Finsbury Square; 10 listed buildings within 150 m of the postcode pin; National infrastructure project about 1.6 km away: Thames Tideway Tunnel; Registered park or garden about 187 m away: Bunhill Fields Burial Ground; Inside the Hackney built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 18 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hackney - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Hackney
Application type
Certificate of Lawful Development Existing/Proposed
Postcode
EC2A 4UY
Received
3 Nov 2026
Validated
4 Nov 2026
Ward
Hoxton East and Shoreditch Ward
Case officer
Show
Target decision
30 Dec 2026
Decision level
Delegated
Applicant
Show
Agent
Enzygo

Decision outlook

Day 19 of the 56-day target. Hackney usually decides utility and infrastructure works by day 81.

Day 1962 days to the predicted decision (day 81)
31%decided within 8 weeks
86%approved
89decided in the last year

Plota live figures for utility and infrastructure works decided by Hackney in the last twelve months, from validation. Hackney decision record →

Consultation & key dates

Statutory expiry
30 Dec 2026
Hackney
Planning Authority Score
2.4/10
Poor
#256 of 296 overall
Relevant to this application:
Householder decisions

Hackney is slower than most councils at deciding householder applications: #220 of 296 on speed. Hackney is also one of the strictest councils - it refuses more householder applications than almost any other, with only 84% approved vs 90% nationally.

One of the strictest councils
only 84% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Hackney decision statistics
Based on MHCLG data, the year to March 2026
82%
Overall approval rate
Below avg (87%) #248 of 296
84%
Householder approved
Below avg (90%) #257 of 296
53%
Decided in 8 weeks
Below avg (63%) #220 of 296
46%
Extended time limit
Above avg (41%) #201 of 296
75%
Minor dwellings approved
204 decided (1-9 homes)
100%
Major dwellings approved
4 decided (10+ homes)
50%
Change of use approved
2 decided
1,323
Total decisions
241 refused in the year to March 2026