25/AP/2730 - Variation Approved

Proposal

Non-material amendment pursuant to planning permission ref. dated 29th April 2025 (for full planning permission for the comprehensive redevelopment of the Canada Water Dockside Site). The amendments include: - Building B1: Alterations to building massing, Alteration to floor-to-floor ceiling heights which allows for additional floor within same building height, Removal of basement and associated ventilation, Relocation of plant / amenity / cycle storage as a result of basement removal and massing alterations, Alterations to room module width and window types to reflect new grid design, Reduction in Level 08 Plant provision with amenity relocated to level 08 (shoulder level), 742no. bedspaces have been maintained, Increase of 59no. habitable rooms due to amendments in accommodation typology (such as cluster accommodation) to total 801no. habitable rooms - Building B2: Reduction to building height, Reduction to Basement footprint, Amendments to building entrances, Additional deck access unit provided and access deck introduced to 1st floor on the Green Street elevation, Additional roof added to southern wing at second floor level, Window and balcony types and positions amended throughout to match new apartment layouts and mix, Uplift of 4no. units to 79no. units of affordable residential housing (Use Class C3), and uplift of 24no. residential habitable rooms to 325no. total; - Amendments to the following conditions:(1) Approved Plans, (3) Site Wide Compliance, (4) Phasing Plan, (54) Basement Ventilation, (56) SuDS, (79) SuDS, (83) Wheelchair User Dwellings, (88) Fire Safety, Correction to duplicate condition 20 and relabelling as condition 30. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
22 Sept 2025
✓
Validated
29 Sept 2025
✓
Approved
7 Nov 2025

Approved on 7 Nov 2025 · Source Team · Last checked 13 Oct 2026

Documents 95

Decision & officer reports 51

PDF CWD-BIG-CW-XX-DR-A-1001-XX REV P02 PROPOSED SITE PLAN Decision - Plans · 4 Nov 2025 View ↗ PDF CWD-TLA-CW-XX-DR-L-3002-XX P05 LANDSCAPE MASTERPLAN PUBLIC REALM Decision - Plans · 21 Oct 2025 View ↗ PDF CWD-TLA-B-00-DR-L-3003-XX P01 SURFACE FINISHES PLAN (TWO WAY PRINTWORKS STREET) Decision - Plans · 21 Oct 2025 View ↗ PDF BIODIVERSITY NET GAIN URBAN GREENING FACTOR ADDENDUM PART 2 OF 2 Decision - Plans · 30 Sept 2025 View ↗ PDF BIODIVERSITY NET GAIN URBAN GREENING FACTOR ADDENDUM PART 1 OF 2 Decision - Plans · 30 Sept 2025 View ↗ PDF CWD-TPB-B-00-DR-A-2000-XX REV P03 GA GROUND FLOOR PLAN Decision - Plans · 30 Sept 2025 View ↗ PDF CWD-TPB-B-01-DR-A-2001-XX REV P03 GA FIRST FLOOR PLAN Decision - Plans · 30 Sept 2025 View ↗ PDF CWD-TPB-B-02-DR-A-2002-XX REV P02 GA SECOND FLOOR PLAN Decision - Plans · 30 Sept 2025 View ↗ PDF CWD-TPB-B-03-DR-A-2003-XX REV P02 GA THIRD FLOOR PLAN Decision - Plans · 30 Sept 2025 View ↗ PDF CWD-TPB-B-04-DR-A-2004-XX REV P01 GA FOURTH FLOOR PLAN Decision - Plans · 30 Sept 2025 View ↗ PDF CWD-TPB-B-05-DR-A-2005-XX REV P02 GA FIFTH FLOOR PLAN Decision - Plans · 30 Sept 2025 View ↗ PDF CWD-TPB-B-06-DR-A-2006-XX REV P01 GA SIXTH FLOOR PLAN Decision - Plans · 30 Sept 2025 View ↗ PDF CWD-TPB-B-07-DR-A-2007-XX REV P02 GA SEVENTH FLOOR PLAN Decision - Plans · 30 Sept 2025 View ↗ PDF CWD-TPB-B-08-DR-A-2008-XX REV P02 GA EIGHTH FLOOR PLAN Decision - Plans · 30 Sept 2025 View ↗ PDF CWD-TPB-B-09-DR-A-2009-XX REV P02 GA NINTH TO FOURTEENTH FLOOR PLAN Decision - Plans · 30 Sept 2025 View ↗ PDF CWD-TPB-B-15-DR-A-2015-XX REV P01 GA FIFTEENTH TO TWENTY-SIXTH FLOOR PLAN Decision - Plans · 30 Sept 2025 View ↗ PDF CWD-TPB-B-XX-DR-A-4003-XX REV P02 GA SECTION CC Decision - Plans · 30 Sept 2025 View ↗ PDF CWD-TPB-B1-XX-DR-A-5000-XX REV P02 TYPICAL BAY STUDIES BUILDING B1 (PBSA) LOWE Decision - Plans · 30 Sept 2025 View ↗ PDF CWD-TPB-B1-XX-DR-A-5001-XX REV P01 TYPICAL BAY STUDIES BUILDING B1 (PBSA) UPPE Decision - Plans · 30 Sept 2025 View ↗ PDF CWD-TPB-B1-XX-DR-A-6010-XX REV P01 ROOM TYPES BUILDING B1 (PBSA) EN-SUITE BEDR Decision - Plans · 30 Sept 2025 View ↗ PDF CWD-TPB-B1-XX-DR-A-6020-XX REV P01 ROOM TYPES BUILDING B1 (PBSA) CLUB STUDIOS Decision - Plans · 30 Sept 2025 View ↗ PDF CWD-TPB-B1-XX-DR-A-6030-XX REV P01 ROOM TYPES BUILDING B1 (PBSA) STANDARD AND Decision - Plans · 30 Sept 2025 View ↗ PDF CWD-TPB-B1-XX-DR-A-6040-XX REV P01 ROOM TYPES BUILDING B1 (PBSA) 1-BED WHEELCH Decision - Plans · 30 Sept 2025 View ↗ PDF CWD-TPB-B2-XX-DR-A-5500-XX REV P02 TYPICAL BAY STUDIES BUILDING B2 (RESIDENTIA Decision - Plans · 30 Sept 2025 View ↗ PDF CWD-TPB-B2-XX-DR-A-5501-XX REV P01 TYPICAL BAY STUDIES BUILDING B2 (RESIDENTIA Decision - Plans · 30 Sept 2025 View ↗ PDF CWD-TPB-B2-XX-DR-A-6510-XX REV P01 APARTMENT TYPES BUILDING B2 (RESIDENTIAL) 1 Decision - Plans · 30 Sept 2025 View ↗ PDF CWD-TPB-B2-XX-DR-A-6520-XX REV P01 APARTMENT TYPES BUILDING B2 (RESIDENTIAL) 2 Decision - Plans · 30 Sept 2025 View ↗ PDF CWD-TPB-B-00-DR-A-1000-XX REV P03 GA SITE PLAN Decision - Plans · 30 Sept 2025 View ↗ PDF CWD-TLA-B-00-DR-L-3001-XX REV P06 SURFACES FINISHES PLAN (TWO-WAY PRINTWORKS S Decision - Plans · 30 Sept 2025 View ↗ PDF CWD-TLA-B-00-DR-L-3011-XX REV P05 SURFACES FINISHES PLAN (ONE-WAY PRINTWORKS S Decision - Plans · 30 Sept 2025 View ↗ PDF CWD-TLA-B-XX-DR-L-3002-XX REV P05 ROOF TERRACES FINISHES PLAN Decision - Plans · 30 Sept 2025 View ↗ PDF CWD-BIG-CW-XX-DR-A-4001-XX REV P01 SITEWIDE ELEVATIONS Decision - Plans · 30 Sept 2025 View ↗ PDF CWD-BIG-CW-XX-DR-A-4002-XX REV P01 SITEWIDE ELEVATIONS Decision - Plans · 30 Sept 2025 View ↗ PDF CWD-TPB-B-B1-DR-A-2099-XX REV P02 GA BASEMENT PLAN Decision - Plans · 30 Sept 2025 View ↗ PDF CWD-TPB-B-RF-DR-A-2027-XX REV P01 GA ROOF PLAN Decision - Plans · 30 Sept 2025 View ↗ PDF CWD-TPB-B-XX-DR-A-3001-XX REV P02 GA ELEVATION SURREY QUAYS ROAD Decision - Plans · 30 Sept 2025 View ↗ PDF CWD-TPB-B-XX-DR-A-3002-XX REV P02 GA ELEVATION CANADA STREET Decision - Plans · 30 Sept 2025 View ↗ PDF CWD-TPB-B-XX-DR-A-3003-XX REV P02 GA ELEVATION GREEN STREET Decision - Plans · 30 Sept 2025 View ↗ PDF CWD-TPB-B-XX-DR-A-3004-XX REV P02 GA ELEVATION PRINTWORKS STREET Decision - Plans · 30 Sept 2025 View ↗ PDF CWD-TPB-B-XX-DR-A-3005-XX REV P02 GA ELEVATION COURTYARD (PBSA) Decision - Plans · 30 Sept 2025 View ↗ PDF CWD-TPB-B-XX-DR-A-3006-XX REV P02 GA ELEVATION COURTYARD (RESIDENTIAL) Decision - Plans · 30 Sept 2025 View ↗ PDF CWD-TPB-B-XX-DR-A-4001-XX REV P02 GA SECTION AA Decision - Plans · 30 Sept 2025 View ↗ PDF CWD-TPB-B-XX-DR-A-4002-XX REV P02 GA SECTION BB Decision - Plans · 30 Sept 2025 View ↗ PDF CWD-BIG-CW-XX-DR-A-0003-XX REV P03 REDLINE PROPOSED SITE PLAN Decision - Plans · 30 Sept 2025 View ↗ PDF INTERNAL DAYLIGHT, SUNLIGHT, OVERSHADOWING ADDENDUM Decision - Plans · 30 Sept 2025 View ↗ PDF CWD-BIG-CW-XX-DR-A-0019-XX REV P03 PHASING DRAWING FOR NEW DETAILED MASTERPLAN Decision - Plans · 30 Sept 2025 View ↗ PDF CWD-TPB-B2-XX-DR-A-6530-XX REV P01 APARTMENT TYPES BUILDING B2 (RESIDENTIAL) 3 BED APARTMENT Decision - Plans · 30 Sept 2025 View ↗ PDF CWD-TPB-B2-XX-DR-A-6531-XX REV P01 APARTMENT TYPES BUILDING B2 3 (RESIDENTIAL) BED APARTMENT Decision - Plans · 30 Sept 2025 View ↗ PDF CWD-TPB-B2-XX-DR-A-6540-XX REV P01 APARTMENT TYPES BUILDING B2 (RESIDENTIAL) 4 BED APARTMENT Decision - Plans · 30 Sept 2025 View ↗ PDF CWD-TPB-B2-XX-DR-A-6541-XX REV P01 APARTMENT TYPES BUILDING B2 (RESIDENTIAL) 4 BED APARTMENT Decision - Plans · 30 Sept 2025 View ↗ PDF CWD-TPB-B2-XX-DR-A-6550-XX REV P01 APARTMENT TYPES BUILDING B2 (RESIDENTIAL) WHEELCHAIR USER Decision - Plans · 30 Sept 2025 View ↗

Statements & assessments 38

PDF CONDITION ASSESSMENTS Biodiversity BNG Metrics · 30 Oct 2025 View ↗ PDF SCENARIO 5 BNG METRIC Biodiversity BNG Metrics · 30 Oct 2025 View ↗ PDF SCENARIO 4 BNG METRIC Biodiversity BNG Metrics · 30 Oct 2025 View ↗ PDF SCENARIO 3 BNG METRIC Biodiversity BNG Metrics · 30 Oct 2025 View ↗ PDF SCENARIO 2 BNG METRIC Biodiversity BNG Metrics · 30 Oct 2025 View ↗ PDF SCENARIO 1 BNG METRIC Biodiversity BNG Metrics · 30 Oct 2025 View ↗ PDF EIA STATEMENT OF CONFORMANCE PARTS 1-7 Environmental statement · 30 Sept 2025 View ↗ PDF DESIGN AND ACCESS STATEMENT ADDENDUM PARTS 1 -14 Design and Access statement · 30 Sept 2025 View ↗ PDF DESIGN AND ACCESS STATEMENT ADDENDUM PART 10 OF 14 Design and Access statement · 30 Sept 2025 View ↗ PDF DESIGN AND ACCESS STATEMENT ADDENDUM PART 11 OF 14 Design and Access statement · 30 Sept 2025 View ↗ PDF DESIGN AND ACCESS STATEMENT ADDENDUM PART 12 OF 14 Design and Access statement · 30 Sept 2025 View ↗ PDF DESIGN AND ACCESS STATEMENT ADDENDUM PART 13 OF 14 Design and Access statement · 30 Sept 2025 View ↗ PDF DESIGN AND ACCESS STATEMENT ADDENDUM PART 14 OF 14 Design and Access statement · 30 Sept 2025 View ↗ PDF DESIGN AND ACCESS STATEMENT ADDENDUM PART 2 OF 14 Design and Access statement · 30 Sept 2025 View ↗ PDF DESIGN AND ACCESS STATEMENT ADDENDUM PART 3 OF 14 Design and Access statement · 30 Sept 2025 View ↗ PDF DESIGN AND ACCESS STATEMENT ADDENDUM PART 4 OF 14 Design and Access statement · 30 Sept 2025 View ↗ PDF DESIGN AND ACCESS STATEMENT ADDENDUM PART 5 OF 14 Design and Access statement · 30 Sept 2025 View ↗ PDF DESIGN AND ACCESS STATEMENT ADDENDUM PART 6 OF 14 Design and Access statement · 30 Sept 2025 View ↗ PDF DESIGN AND ACCESS STATEMENT ADDENDUM PART 7 OF 14 Design and Access statement · 30 Sept 2025 View ↗ PDF DESIGN AND ACCESS STATEMENT ADDENDUM PART 8 OF 14 Design and Access statement · 30 Sept 2025 View ↗ PDF DESIGN AND ACCESS STATEMENT ADDENDUM PART 9 OF 14 Design and Access statement · 30 Sept 2025 View ↗ PDF EIA STATEMENT OF CONFORMANCE PART 2 OF 7 Environmental statement · 30 Sept 2025 View ↗ PDF EIA STATEMENT OF CONFORMANCE PART 3 OF 7 Environmental statement · 30 Sept 2025 View ↗ PDF EIA STATEMENT OF CONFORMANCE PART 4 OF 7 Environmental statement · 30 Sept 2025 View ↗ PDF EIA STATEMENT OF CONFORMANCE PART 5 OF 7 Environmental statement · 30 Sept 2025 View ↗ PDF EIA STATEMENT OF CONFORMANCE PART 6 OF 7 Environmental statement · 30 Sept 2025 View ↗ PDF EIA STATEMENT OF CONFORMANCE PART 7 OF 7 Environmental statement · 30 Sept 2025 View ↗ PDF LANDSCAPE STRATEGY ADDENDUM PART 1 OF 2 Landscaping and open space statement · 30 Sept 2025 View ↗ PDF LANDSCAPE STRATEGY ADDENDUM PART 2 OF 2 Landscaping and open space statement · 30 Sept 2025 View ↗ PDF BASEMENT IMPACT ASSESSMENT ADDENDUM Basement Impact Assessment · 30 Sept 2025 View ↗ PDF GATEWAY ONE FIRE STATEMENT Fire Statement · 30 Sept 2025 View ↗ PDF SURFACE WATER DRAINAGE STRATEGY ADDENDUM Drainage strategy · 30 Sept 2025 View ↗ PDF SUSTAINABILITY STATEMENT ADDENDUM Sustainability appraisal · 30 Sept 2025 View ↗ PDF TRANSPORT ASSESSMENT ADDENDUM Transport assessment · 30 Sept 2025 View ↗ PDF CIRCULAR ECONOMY STATEMENT OF CONFORMANCE Circular Economy Statement · 30 Sept 2025 View ↗ PDF ENERGY STATEGY STATEMENT OF CONFORMANCE Energy statement · 30 Sept 2025 View ↗ PDF LONDON PLAN FIRE STATEMENT Fire Statement · 30 Sept 2025 View ↗ PDF UTILITIES STATEMENT ADDENDUM Utilities statement · 30 Sept 2025 View ↗

All documents on the council site ↗

Associated applications 19

Site constraints 11

Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
2 Article 4 directions
Site allocation NSP80: Decathlon Site and Mulberry Business Park · Canada Water Major Town Centre. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
National infrastructure project: Thames Tideway Tunnel
The site is inside the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, 408 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Southwark AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: Canada Water
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
Local nature reserve 293 m away: Stave Hill Ecology Park
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Inside the Southwark built-up area; Public transport access: PTAL 6a (excellent), TfL 2023, for the 100 m square; Tree preservation order 29 m away: Former Mulberry Business Park Land Bounded By Canada Street Quebec Way And Harmsworth Quays Print Works London SE16.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area1,853 m² (19,946 sq ft)
Energy ratingC (asset rating 57)
UseA1/A2 Retail and Financial/Professional services
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in July 2021, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Southwark - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Southwark
Application type
Variation
Postcode
SE16 2XU
Received
22 Sept 2025
Validated
29 Sept 2025
Ward
Rotherhithe
Parish
Bermondsey And Rotherhithe
Case officer
Show
Target decision
12 Nov 2025
Decision
Agreed - for App Types VLA and VNMC
Decision date
7 Nov 2025
Decision level
Source Team
Agent
DP9 Ltd

Public comments

No public comments yet.

Last counted 13 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
26 Oct 2025
Env. assessment
No
Southwark
Planning Authority Score
7/10
Good
#64 of 296 councils
Relevant to this application:
Householder decisions

Southwark is faster than most councils at deciding householder applications, ranking #54 out of 296. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Southwark decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #93 of 296
95%
Householder approved
Above avg (90%) #92 of 296
78%
Decided in 8 weeks
Above avg (63%) #54 of 296
37%
Extended time limit
Below avg (41%) #122 of 296
92%
Minor dwellings approved
259 decided (1-9 homes)
86%
Major dwellings approved
14 decided (10+ homes)
82%
Change of use approved
38 decided
1,622
Total decisions
132 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.