The Orchard Carleton Road PENRITH CA11 8LT Data via plota.co.uk

2026/1253/DISC - Approval of Details Reserved by Condition(s) Valid

Proposal

Discharge of condition 8 (method statement for the bin store area) attached to approval 2025/1336/FPA (Variation of condition 2 (approved plans) for amendments to the access, attached to approval .) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
16 Jun 2026
Decision
Target date was 11 Aug 2026

Under consideration

No decision has been issued yet. The council's target date, 11 Aug 2026, has passed.

Associated applications 3

Site constraints 5

Nutrient neutrality catchment: River Eden SAC
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
National infrastructure project about 557 m away: A66 Northern Trans-Pennine Project
The site is about 557 m from the project boundary. Highway, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Radon affected area, class 4; Inside the Penrith built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Westmorland and Furness - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Approval of Details Reserved by Condition(s)
Postcode
CA11 8LT
Received
16 Jun 2026
Validated
16 Jun 2026
Ward
Penrith North, Penrith South
Parish
Penrith
Case officer
Show
Decision level
Delegated
Applicant
Show
Agent
Manning Elliott Architects

Consultation & key dates

Statutory expiry
11 Aug 2026
Westmorland and Furness
Planning Authority Score
3.1/10
Poor
#233 of 296 overall
Relevant to this application:
Major dwellings

Westmorland and Furness is slower than most councils at deciding householder applications: #235 of 296 on speed. 52% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Westmorland and Furness decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #96 of 296
93%
Householder approved
Above avg (90%) #145 of 296
51%
Decided in 8 weeks
Below avg (63%) #235 of 296
52%
Extended time limit
Above avg (41%) #238 of 296
84%
Minor dwellings approved
69 decided (1-9 homes)
100%
Major dwellings approved
18 decided (10+ homes)
89%
Change of use approved
135 decided
1,204
Total decisions
91 refused in the year to March 2026