26/01167/CONDC - Condition Clearance Awaiting decision

Proposal

Application for the approval of details reserved by condition no. 52 (Odour Management Plan) of planning permission ref: 12.04.09. as varied (For the Construction and Operation of a Biomass and Energy from Waste Fuelled Electricity Generating Station at Tilbury Docks (Tilbury Green Power) (s36 Electricity Act). Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
5 Oct 2026
✓
Validated
6 Oct 2026
Decision
Expected by 1 Dec 2026

Under consideration

No decision has been issued yet. A decision is expected by 1 Dec 2026.

Comments are open until 27 Oct 2026

Comment on this application ↗

Site constraints 3

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
National infrastructure project about 467 m away: Lower Thames Crossing
The site is about 467 m from the project boundary. Highway, decided. The project page says whether consent was granted. Also within 2 km: Tilbury2 (decided, about 525 m); Thurrock Flexible Generation Plant (decided, about 1721 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Tilbury built-up area.
Not affected
Not green belt · No scheduled monument at the site

Checked on 7 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Thurrock - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Thurrock
Application type
Condition Clearance
Received
5 Oct 2026
Validated
6 Oct 2026
Ward
Tilbury Riverside
Case officer
Show
Target decision
1 Dec 2026
Applicant
Show

Public comments

No public comments yet.

Last counted 7 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Comments by
27 Oct 2026
Statutory expiry
1 Dec 2026
Env. assessment
No
Thurrock
Planning Authority Score
6/10
Average
#104 of 296 councils
Relevant to this application:
Householder decisions

Thurrock is one of the fastest councils in England for householder decisions, ranking #25 out of 296. Thurrock is also one of the strictest councils - it refuses more householder applications than almost any other, with only 82% approved vs 90% nationally.

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Thurrock decision statistics
Based on MHCLG data, the year to March 2026
82%
Overall approval rate
Below avg (87%) #252 of 296
82%
Householder approved
Below avg (90%) #271 of 296
84%
Decided in 8 weeks
Above avg (63%) #25 of 296
31%
Extended time limit
Below avg (41%) #62 of 296
65%
Minor dwellings approved
74 decided (1-9 homes)
43%
Major dwellings approved
7 decided (10+ homes)
86%
Change of use approved
43 decided
671
Total decisions
124 refused in the year to March 2026