Car Park Alphington Road Retail Park Alphington Road Exeter Data via plota.co.uk

26/1408/FUL - Full Planning Permission Pending Consideration

Proposal

Installation of electric vehicle chargers, lighting/CCTV, fencing and associated infrastructure. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
18 Sept 2026
✓
Validated
25 Sept 2026
Decision
Expected by 11 Dec 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 23 Nov 2026; it is now day 59.

Site constraints 4

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Also on the record
Radon affected area, class 2; Conservation area 67 m away: Princes Square; Inside the Exeter built-up area.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Exeter - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Exeter
Application type
Full Planning Permission
Postcode
EX2 8HP
Received
18 Sept 2026
Validated
25 Sept 2026
Ward
Alphington
Case officer
Show
Target decision
11 Dec 2026
Agent
Planware Ltd

Decision outlook

Day 59, past the statutory target. 86% of utility and infrastructure works in Exeter are decided within thirteen weeks, which runs to 25 Dec 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 22 Nov 2026.

Day 593 days past the 56-day target
74%decided within 8 weeks
80%approved
39decided in the last year

Plota live figures for utility and infrastructure works decided by Exeter in the last twelve months, from validation. Exeter decision record →

Public comments

No public comments yet.

2 neighbours consulted · Last counted 22 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15147631
Planning Portal ref
PP-15147631
Statutory expiry
21 Nov 2026
Env. assessment
No
Exeter
Planning Authority Score
3.2/10
Poor
#228 of 296 overall
Relevant to this application:
Householder decisions

Exeter is slower than most councils at deciding householder applications: #214 of 296 on speed. Householder applications are slightly less likely to be approved here (86%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Exeter decision statistics
Based on MHCLG data, the year to March 2026
85%
Overall approval rate
Below avg (87%) #205 of 296
86%
Householder approved
Below avg (90%) #242 of 296
54%
Decided in 8 weeks
Below avg (63%) #214 of 296
40%
Extended time limit
Below avg (41%) #150 of 296
58%
Minor dwellings approved
31 decided (1-9 homes)
60%
Major dwellings approved
5 decided (10+ homes)
90%
Change of use approved
40 decided
582
Total decisions
86 refused in the year to March 2026