26/AP/2258 - Major application Awaiting decision

Proposal

The demolition of existing industrial units (use class E(g)(iii) and B8) and the erection of a storage and distribution facility (use class B8) and workspace (flexible use class E(g)(i)/(ii)/(iii))) together with vehicular and pedestrian accesses, parking, associated works and landscaping. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
29 Jul 2026
✓
Validated
6 Aug 2026
Decision
Expected by 5 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision by 22 Oct 2026, from Southwark's recent commercial and major works.

Documents 26

All documents on the council site ↗

Site constraints 10

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
2 Article 4 directions
SPIL6: Old Jamaica Road Business Estate · Railway Arches. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Strategic industrial land
Reserved for industry and logistics.
The London Plan protects strategic industrial locations from other uses; release needs a plan-led process.
Archaeological priority area: North Southwark and Roman Roads
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Southwark AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 5 m away: Thames Tideway Tunnel
The site is 5 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, the site is inside its boundary).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
3 listed buildings within 150 m; Radon affected area, class 2; Inside the Southwark built-up area; Public transport access: PTAL 4 (good), TfL 2023, for the 100 m square.
Not affected
Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI), Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Southwark - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Southwark
Application type
Major application
Postcode
SE16 4AW
Received
29 Jul 2026
Validated
6 Aug 2026
Ward
North Bermondsey
Parish
Bermondsey And Rotherhithe
Case officer
Show
Target decision
5 Nov 2026
Applicant
Show
Agent
Planning Potential Ltd.

Decision outlook

Day 64, past the statutory target. 63% of commercial and major works in Southwark are decided within thirteen weeks, which runs to 5 Nov 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 2 Oct 2026.

Day 648 days past the 56-day target
46%decided within 8 weeks
92%approved
8%go to committee

Plota live figures for commercial and major works decided by Southwark in the last twelve months, from validation. Southwark decision record →

Public comments

37comments received
31 objecting2 neutral4 supporting

84% object · above the UK average of 74%

679 neighbours consulted · Last counted 2 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Committee
7 Oct 2026
Statutory expiry
5 Nov 2026
Env. assessment
No
Southwark
Planning Authority Score
7/10
Good
#64 of 296 councils
Relevant to this application:
Major dwellings

Southwark is faster than most councils at deciding householder applications, ranking #54 out of 296. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Southwark decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #93 of 296
95%
Householder approved
Above avg (90%) #92 of 296
78%
Decided in 8 weeks
Above avg (63%) #54 of 296
37%
Extended time limit
Below avg (41%) #122 of 296
92%
Minor dwellings approved
259 decided (1-9 homes)
86%
Major dwellings approved
14 decided (10+ homes)
82%
Change of use approved
38 decided
1,622
Total decisions
132 refused in the year to March 2026