Capel Hiraethog Quarry, Cyffylliog, Ruthin, Denbighshire Data via plota.co.uk

14/2025/0439/AA - Agri. Prior Notification - Roads, Tanks, Other Pending Consideration

Proposal

Hysbysiad ymlaen llaw ar gyfer echdynnu cerrig ar gyfer cynnal a chadw ffyrdd coedwig presennol / Prior notification for the extraction of stone for maintenance of existing forest roads Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
1 Oct 2025
Decision
Target date was 26 Nov 2025

Under consideration

No decision has been issued yet. Plota predicted a decision around 18 Nov 2026; it is now day 413.

Site constraints 4

Agricultural land, grade 4
Poor quality farmland, not best and most versatile. Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project 641 m away: Clocaenog Forest Wind Farm
The site is 641 m from the project boundary. Generating station, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Radon affected area, class 4; Scheduled monument 199 m away: Capel Hiraethog Round Barrow.
Not affected
Outside flood zones 2 and 3 · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Denbighshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Agri. Prior Notification - Roads, Tanks, Other
Received
1 Oct 2025
Validated
1 Oct 2025
Ward
WD15 - Llanrhaeadr-yng-Nghinmeirch
Parish
Cyffylliog CC (14)
Case officer
Show
Target decision
26 Nov 2025
Applicant
Show

Decision outlook

Day 413, past the statutory target. 97% of prior approvals in Denbighshire are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 17 Nov 2026.

Day 413357 days past the 56-day target
92%decided within 8 weeks
83%approved
34,585decided in the last year

Plota live figures for prior approvals decided across the UK in the last twelve months, from validation; too few recent prior approvals in Denbighshire to go on. Denbighshire decision record →

Consultation & key dates

Statutory expiry
26 Nov 2025