The site for the proposed new reservoir is south west of Abingdon in Oxfordshire. The site is bounded by the… Data via plota.co.uk

WA010005 - WA01 - Dams and Reservoirs Pending

Proposal

White Horse Reservoir (previously known as South East Strategic Reservoir Option). Reservoir exceeding 30 million cubic metres of water storage, together with associated development required for the construction and operation of the project including, but not limited to, water transfer tunnel/pipelines; water inlet and outlet structures; pumping stations; watercourse diversions; new access roads; temporary railways sidings for material handling; parking, wildlife and environmental areas; leisure and recreation and education facilities. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
19 Nov 2026
Decision
Expected by 14 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision between 14 Jan 2027 and 27 Jan 2027, from recent full applications across the UK.

Site constraints 2

Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 4. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Also on the record
National infrastructure project: White Horse Reservoir (previously known as South East Strategic Reservoir Option), at pre-application.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 21 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in National Infrastructure Projects (England) - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
WA01 - Dams and Reservoirs
Received
19 Nov 2026
Applicant
Show

Decision outlook

Day 4 of the 56-day target. Councils usually decide full applications by day 57.

Day 453 days to the predicted decision (day 57)
49%decided within 8 weeks
87%approved
158,523decided in the last year

Plota live figures for full applications decided across the UK in the last twelve months, from validation; too few recent full applications in National Infrastructure Projects (England) to go on. National Infrastructure Projects (England) decision record →