Translink Newtownabbey Bus Depot, Monkstown Avenue, Monkstown Industrial Estate, Newtownabbey Data via plota.co.uk

LA03/2026/0534/F - Full Consultation Open

Proposal

Provision Of 37No. Electrical Vehicle (‘EV’) Charging Units (26No. HYC 50 EV Units, 7No. HYC 200 EV Units And 4No. EVA-22D-SE Van Charger EV Units); Erection Of 1No. Transformer Kiosk, 2No. Combined Low Voltage (‘LV’) Switch Room And Transformer Room Buildings, and Amendments To Boundary Wall To Provide Area For Future Northern Ireland Electricity Ring Main Unit (‘RMU’) Kiosk; Provision Of Associated Site Infrastructure (Including: Parking Bollards; Bus Wheel Stops; Armco Barriers; 1No. CCTV camera mounted to existing lighting column; and 4No. 12metre High Lighting Columns); Alterations To Existing Bus Parking Area, Including Reduction And Relocation Of Existing Hydrogen Bus Heater Battery Plugs, Removal Of Existing Storage Building To Facilitate Modification Of Existing Pedestrian Walkway, Reconfigured Bus Parking Bays And Provision Of Fenced Service Yard And Bus Turning Area; And All Associated Site Works… Data via plota.co.uk

View original council record ↗

Application progress

Received
21 Jul 2026
Validated
22 Jul 2026
Consultation
6 Aug 2026
Decision
Awaiting decision

This application is under consideration - no decision has been issued yet. Comments are open until 27 Aug 2026.

Comment on this application ↗

Documents 37

Plans & drawings 22

PDF 05-Lighting layout [A0] Site Layout or Block Plan · 4 Aug 2026 View ↗ PDF 03-Proposed site layout [A1] Site Layout or Block Plan · 4 Aug 2026 View ↗ PDF 02-Existing site layout [A1] Site Layout or Block Plan · 4 Aug 2026 View ↗ PDF 06-Lux levels [A0] Site Layout or Block Plan · 4 Aug 2026 View ↗ PDF 01-Site location plan [A1] Site Location Plan · 4 Aug 2026 View ↗ PDF 18-Proposed transformer room 1 and LV switch room 1 sections AA, BB & CC [A3] Levels and Cross Sections · 4 Aug 2026 View ↗ PDF 22-Proposed transformer room 2 and LV switch room 2 sections AA, BB & CC [A3] Levels and Cross Sections · 4 Aug 2026 View ↗ PDF 14-Proposed HV switchroom 1 sections AA & BB [A3] Levels and Cross Sections · 4 Aug 2026 View ↗ PDF 07-Proposed sections AA & BB [A1] Levels and Cross Sections · 4 Aug 2026 View ↗ PDF 08-Proposed sections CC & DD [A1] Levels and Cross Sections · 4 Aug 2026 View ↗ PDF 09-Proposed section EE [A1] Levels and Cross Sections · 4 Aug 2026 View ↗ PDF 10-Proposed levels [A1] Levels and Cross Sections · 4 Aug 2026 View ↗ PDF 23-Proposed details [A1] Proposed Elevations · 4 Aug 2026 View ↗ PDF 13-Proposed HV switchroom 1 elevations [A3] Proposed Elevations · 4 Aug 2026 View ↗ PDF 17-Proposed transformer room 1 and LV switch room 1 elevations [A3] Proposed Elevations · 4 Aug 2026 View ↗ PDF 21-Proposed transformer room 2 and LV switch room 2 elevations [A3] Proposed Elevations · 4 Aug 2026 View ↗ PDF 15-Proposed transformer room 1 and LV switch room 1 area plan [A4] Proposed Floor Plans · 4 Aug 2026 View ↗ PDF 19-Proposed transformer room 2 and LV switch room 2 area plan [A4] Proposed Floor Plans · 4 Aug 2026 View ↗ PDF 20-Proposed transformer room 2 and LV switch room 2 floor plan and roof plan [A3] Proposed Floor Plans · 4 Aug 2026 View ↗ PDF 16-Proposed transformer room 1 and LV switch room 1 floor plan and roof plan [A3] Proposed Floor Plans · 4 Aug 2026 View ↗ PDF 11-Proposed HV switchroom 1 area plan [A4] Proposed Floor Plans · 4 Aug 2026 View ↗ PDF 12-Proposed HV switchroom 1 floor plan and roof plan [A3] Proposed Floor Plans · 4 Aug 2026 View ↗

All documents on the council site ↗

Work with planning data? Every application in Antrim and Newtownabbey - and every UK council - as a live feed or API. About Plota's data service

Important details

Application type
Full
Postcode
BT37 0TZ
Received
21 Jul 2026
Validated
22 Jul 2026
Ward
Monkstown
Applicant
Show
Agent
Tetra Tech Consulting (NI) Ltd

Consultation & key dates

Neighbours
7 Aug 2026
Consultation
6 Aug 2026
Comments by
27 Aug 2026