Crown And Mayer Parry Wharf Bidder Street Canning Town London E16 4ST Data via plota.co.uk

25/02737/NONMAT - Non Material Change Approved

Proposal

Non-material amendment to the Planning Permission dated on 5th September 2024, comprising the amendments to description of development to include two additional storeys to Blocks B3 and B2 and provision of a total of 873 dwellings (Use Class C3) and 2,635sqm (GIA) employment space (Use Class E) across the site; affordable housing tenure; and wording of condition 2 (approved plans) to allow the substitution of plans reflecting the reconfiguration of residential and commercial floorspace Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 15 Dec 2025
✓
Approved
29 Jul 2026

Approved on 29 Jul 2026 · Delegated decision · Last checked 3 Oct 2026

Documents 40

Plans & drawings 25

PDF CROWH-JTP-B3-ZZ-DP-AR-02025 - BUILDING B3 SECTIONS_P1 Drawing · 10 Dec 2025 View ↗ PDF CROWH-JTP-A4-ZZ-DP-AR-02024 - BUILDING A4 SECTIONS_P1 Drawing · 10 Dec 2025 View ↗ PDF CROWH-JTP-ZZ-08-DP-AR-01007-LEVELS 08-10-P5 Drawing · 1 Dec 2025 View ↗ PDF CROWH-JTP-ZZ-11-DP-AR-01008-LEVELS 11-13-P5 Drawing · 1 Dec 2025 View ↗ PDF CROWH-JTP-ZZ-14-DP-AR-01009-LEVELS 14-15-P5 Drawing · 1 Dec 2025 View ↗ PDF CROWH-JTP-ZZ-16-DP-AR-01010-LEVELS 16-25-P5 Drawing · 1 Dec 2025 View ↗ PDF CROWH-JTP-ZZ-26-DP-AR-01011-LEVEL 26-P5 Drawing · 1 Dec 2025 View ↗ PDF CROWH-JTP-ZZ-27-DP-AR-01012-LEVEL 27-30-P5 Drawing · 1 Dec 2025 View ↗ PDF CROWH-JTP-ZZ-31-DP-AR-01013-LEVEL 31-P5 Drawing · 1 Dec 2025 View ↗ PDF CROWH-JTP-ZZ-GF-DP-AR-01004-LOWER GROUND FLOOR-P5 Drawing · 1 Dec 2025 View ↗ PDF CROWH-JTP-ZZ-RP-DP-AR-01014-ROOF PLAN-P5 Drawing · 1 Dec 2025 View ↗ PDF CROWH-JTP-ZZ-00-DP-AR-01005-UPPER GROUND FLOOR-P5 Drawing · 1 Dec 2025 View ↗ PDF CROWH-JTP-ZZ-01-DP-AR-01006-LEVELS 01-05-P5 Drawing · 1 Dec 2025 View ↗ PDF CROWH-JTP-ZZ-06-DP-AR-01015 - LEVEL 06-07-P1 Drawing · 1 Dec 2025 View ↗ PDF CROWH-JTP-B1-ZZ-DP-AR-02016-BUILDING B1 ELEVATIONS-P5 Drawing · 1 Dec 2025 View ↗ PDF CROWH-JTP-B2-ZZ-DP-AR-02017-BUILDING B2 ELEVATIONS-P5 Drawing · 1 Dec 2025 View ↗ PDF CROWH-JTP-B3-ZZ-DP-AR-02022-BUILDING B3 ELEVATIONS A AND B-P1 Drawing · 1 Dec 2025 View ↗ PDF CROWH-JTP-B3-ZZ-DP-AR-02023-BUILDING B3 ELEVATIONS C AND D-P1 Drawing · 1 Dec 2025 View ↗ PDF CROWH-JTP-A1-ZZ-DP-AR-02013-BUILDING A1 ELEVATIONS-P5 Drawing · 1 Dec 2025 View ↗ PDF CROWH-JTP-A2-ZZ-DP-AR-02014-BUILDING A2 ELEVATIONS-P5 Drawing · 1 Dec 2025 View ↗ PDF CROWH-JTP-A3-ZZ-DP-AR-02015-BUILDING A3 ELEVATIONS-P5 Drawing · 1 Dec 2025 View ↗ PDF CROWH-JTP-A4-ZZ-DP-AR-02020-BUILDING A4 ELEVATIONS A AND B-P1 Drawing · 1 Dec 2025 View ↗ PDF CROWH-JTP-A4-ZZ-DP-AR-02021-BUILDING A4 ELEVATIONS C AND D-P1 Drawing · 1 Dec 2025 View ↗ PDF 01450D-CROWH-JTP-AZ-ZZ-DP-AR-02018-BUILDING A SECTIONS-P5 Drawing · 1 Dec 2025 View ↗ PDF 01450D-CROWH-JTP-BZ-ZZ-DP-AR-02019-BUILDING B SECTIONS-P5 Drawing · 1 Dec 2025 View ↗

All documents on the council site ↗

Associated applications 10

Site constraints 7

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Newham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 826 m away: Silvertown Tunnel
The site is 826 m from the project boundary. Highway, decided. The project page says whether consent was granted. Also within 2 km: Thames Tideway Tunnel (decided, 949 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Inside the Newham built-up area; Public transport access: PTAL 6a (excellent), TfL 2023, for the 100 m square.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Newham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Newham
Application type
Non Material Change
Postcode
E16 4ST
Received
around 15 Dec 2025
Validated
15 Dec 2025
Case officer
Show
Decision
Approve
Decision date
29 Jul 2026
Decision level
Delegated decision
Applicant
Show
Agent
Carter Jonas

Public comments

No public comments yet.

Last counted 3 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Env. assessment
No
Newham
Planning Authority Score
3.7/10
Below average
#211 of 296 councils
Relevant to this application:
Major dwellings

Newham ranks #191 out of 296 councils for householder decision speed. Householder applications are slightly less likely to be approved here (87%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Newham decision statistics
Based on MHCLG data, the year to March 2026
83%
Overall approval rate
Below avg (87%) #239 of 296
87%
Householder approved
Below avg (90%) #233 of 296
59%
Decided in 8 weeks
Below avg (63%) #191 of 296
39%
Extended time limit
Below avg (41%) #140 of 296
51%
Minor dwellings approved
67 decided (1-9 homes)
100%
Major dwellings approved
2 decided (10+ homes)
59%
Change of use approved
51 decided
989
Total decisions
170 refused in the year to March 2026