St Marys Church Holt Road Kelling Norfolk Data via plota.co.uk

PF/26/1986 - Full Planning Permission Pending Consideration

Proposal

Construct a single storey wooden pavilion for use as a kitchenette to serve light refreshments inclusive of septic tank. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
18 Sept 2026
✓
Validated
8 Oct 2026
✓
Consultation
5 Nov 2026
Decision
Expected by 3 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 8 Dec 2026 and 31 Dec 2026, from North Norfolk's recent commercial and major works.

Comments are open until 26 Nov 2026

Comment on this application ↗

Site constraints 7

Norfolk Coast National Landscape
Great weight to conserving the landscape; major development restricted.
Previously an area of outstanding natural beauty, which is still the designation in law. Since 2023 authorities must seek to further its purpose, not merely have regard to it.
Kelling conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 3. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project about 101 m away: Hornsea Project Three Offshore Wind Farm
The site is about 101 m from the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: Sheringham and Dudgeon Extension Projects (decided, about 860 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
3 listed buildings within 150 m of the postcode pin
Nearest: Kelling War Memorial, Grade II, about 24 m from the postcode pin · 3 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 3 with distances
Historic England ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Radon affected area, class 2.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 11 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in North Norfolk - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Received
18 Sept 2026
Validated
8 Oct 2026
Ward
Coastal
Parish
Kelling
Case officer
Show
Target decision
3 Dec 2026
Decision level
Delegated Decision
Applicant
Show

Decision outlook

Day 46 of the 56-day target. North Norfolk usually decides commercial and major works by day 69.

Day 4623 days to the predicted decision (day 69)
38%decided within 8 weeks
88%approved
61decided in the last year

Plota live figures for commercial and major works decided by North Norfolk in the last twelve months, from validation. North Norfolk decision record →

Public comments

No public comments yet.

Last counted 22 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15232010
Planning Portal ref
PP-15232010
Consultation
5 Nov 2026
Comments by
26 Nov 2026
Site or press notice
15 Oct 2026
Statutory expiry
3 Dec 2026
Env. assessment
No
North Norfolk
Planning Authority Score
5.4/10
Average
#125 of 296 overall
Relevant to this application:
Householder decisions

North Norfolk is #175 of 296 councils on householder decision speed. Householder applications are slightly more likely to be approved here (96%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
North Norfolk decision statistics
Based on MHCLG data, the year to March 2026
94%
Overall approval rate
Above avg (87%) #43 of 296
96%
Householder approved
Above avg (90%) #56 of 296
61%
Decided in 8 weeks
Below avg (63%) #175 of 296
44%
Extended time limit
Above avg (41%) #183 of 296
85%
Minor dwellings approved
113 decided (1-9 homes)
81%
Major dwellings approved
16 decided (10+ homes)
85%
Change of use approved
34 decided
906
Total decisions
56 refused in the year to March 2026