Rear Of Albion Primary School (Southern End) Albion Street London SE16 7JD Data via plota.co.uk

25/AP/2102 - Section 106 - Satisfying an obligation Approved

Proposal

Discharge S106 Schedule 7 (Car Club Highway Works) agreement associated with planning permission ref. . Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
17 Jul 2025
✓
Validated
18 Jul 2025
✓
Approved
20 Aug 2025

Approved on 20 Aug 2025 · Source Team · Last checked 15 Oct 2026

Associated applications 5

Site constraints 8

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
National infrastructure project: Thames Tideway Tunnel
The site is inside the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, 251 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Air quality management area: Southwark AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
4 listed buildings within 150 m
Nearest: The Finnish Church Including Attached Tower, Grade II, 42 m away · 4 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 4 with distances
Historic England ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Scheduled monument 182 m away: Pumping engine house for Brunel's Thames tunnel; Inside the Southwark built-up area; Public transport access: PTAL 6a (excellent), TfL 2023, for the 100 m square.
Not affected
Not green belt

Checked on 1 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Southwark - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Southwark
Application type
Section 106 - Satisfying an obligation
Postcode
SE16 7JD
Received
17 Jul 2025
Validated
18 Jul 2025
Ward
Rotherhithe
Parish
Bermondsey And Rotherhithe
Case officer
Show
Target decision
11 Sept 2025
Decision
Agreed - for App Types VLA and VNMC
Decision date
20 Aug 2025
Decision level
Source Team
Applicant
Show

How this decision compares

Decided in 33 days from validation, 20 days faster than Southwark's median of 53 for section 106 and planning obligations. Approved, as 99% of section 106 and planning obligations here are.

55%decided within 8 weeks
99%approved
208decided in the last year

Plota live figures for section 106 and planning obligations decided by Southwark in the last twelve months, from validation. Southwark decision record →

Public comments

No public comments yet.

Last counted 15 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
11 Sept 2025
Env. assessment
No
Southwark
Planning Authority Score
7/10
Good
#64 of 296 overall
Relevant to this application:
Householder decisions

Southwark is faster than most councils at deciding householder applications: #54 of 296 on speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Southwark decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #93 of 296
95%
Householder approved
Above avg (90%) #92 of 296
78%
Decided in 8 weeks
Above avg (63%) #54 of 296
37%
Extended time limit
Below avg (41%) #122 of 296
92%
Minor dwellings approved
259 decided (1-9 homes)
86%
Major dwellings approved
14 decided (10+ homes)
82%
Change of use approved
38 decided
1,622
Total decisions
132 refused in the year to March 2026