Weston Rugby Football Club Sunnyside Road North Weston-super-Mare BS23 3PA Data via plota.co.uk

25/P/1941/AOC - Approval of Condition Approved

Proposal

Request to discharge conditions 6 (Phasing Plan), 10 (Surface water strategy), 14 (Remediation Strategy), 16 (Construction Management Plan) and 19, (Construction Environment Management Plan, CEMP) on application . Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
18 Sept 2025
✓
Validated
29 Sept 2025
✓
Approved
2 Sept 2026

Approved on 2 Sept 2026 · Delegated Decision · Last checked 9 Nov 2026

Documents 52

Other documents 24

PDF APPROVAL OF CONDITIONS 10 - 25/P/1941/AOC Discharge of Conditions · 14 Sept 2026 View ↗ PDF APPROVAL OF CONDITION 10 - 25/P/1941/AOC Discharge of Conditions · 2 Sept 2026 View ↗ PDF APPROVAL OF CONDITION 19 - 25/P/1941/AOC Discharge of Conditions · 1 Sept 2026 View ↗ PDF APPENDIX CEMP REV A Report · 22 Dec 2025 View ↗ PDF 231017_PCI_1802_WSMRFC_FINAL APPENDIX 1 - PRE CONSTRUCTION INFORMATION Report · 29 Sept 2025 View ↗ PDF 1802A-MET-ZZ-XX-HS-Z-9902-S2-P01 APPENDIX 1 - SIGNIFICANT RISK & RESIDUAL HAZARDS REGISTER Report · 29 Sept 2025 View ↗ PDF P1976.1 APPENDIX 2 - GROUND INVESTIGATION Report · 29 Sept 2025 View ↗ PDF CJAGL FINAL_1 APPENDIX 2 - FACTUAL AND INTERPRETATIVE REPORT Report · 29 Sept 2025 View ↗ PDF CJAGL FINAL_2 APPENDIX 2 - FACTUAL AND INTERPRETATIVE REPORT Report · 29 Sept 2025 View ↗ PDF 05-09 REV C APPENDIX 4 - SITE LOGISTICS CAFE OPTION Report · 29 Sept 2025 View ↗ PDF R4026 REV A APPENDIX 5 - SITE RULES Report · 29 Sept 2025 View ↗ PDF 05-09 REV C APPENDIX 5 - SITE LOGISTICS CAFE OPTION Report · 29 Sept 2025 View ↗ PDF REV A APPENDIX 6 - SITE SPECIFIC EMERGENCY PROCEDURES Report · 29 Sept 2025 View ↗ PDF REV A APPENDIX 6 - EARLY STAGE FIRE STRATEGY Report · 29 Sept 2025 View ↗ PDF ROP 035 APPENDIX 6 - INCIDENT REPORTING Report · 29 Sept 2025 View ↗ PDF ROP 022 APPENDIX 6 - FIRE & EMERGENCY PROVISIONS Report · 29 Sept 2025 View ↗ PDF APPENDIX 6 - HYDRANT LOCATIONS Report · 29 Sept 2025 View ↗ PDF APPENDIX 8 - HYDRANT LOCATIONS Report · 29 Sept 2025 View ↗ PDF ROP 022 APPENDIX 8 - FIRE & EMERGENCY PROVISIONS Report · 29 Sept 2025 View ↗ PDF REV A APPENDIX 8 - EARLY STAGE FIRE STRATEGY Report · 29 Sept 2025 View ↗ PDF REV A APPENDIX 8 - SITE SPECIFIC EMERGENCY PROCEDURES Report · 29 Sept 2025 View ↗ PDF REV A APPENDIX 9 - PLOT A SWMP Report · 29 Sept 2025 View ↗ PDF REV A APPENDIX 12 - CEMP Report · 29 Sept 2025 View ↗ PDF REV A MAIN REPORT CPHSP Report · 29 Sept 2025 View ↗

All documents on the council site ↗

Associated applications 6

Site constraints 4

In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Also on the record
SSSI 425 m away: Ellenborough Park West SSSI; 1 listed building within 150 m; Inside the Weston-super-Mare built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 9 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in North Somerset - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Approval of Condition
Postcode
BS23 3PA
Received
18 Sept 2025
Validated
29 Sept 2025
Ward
Weston-super-Mare South Ward
Parish
Weston-super-Mare
Case officer
Show
Target decision
24 Nov 2025
Decision
Approve (discharge condition)(RDC)
Decision date
2 Sept 2026
Decision level
Delegated Decision
Applicant
Show
Agent
AWW

How this decision compares

Decided in 338 days from validation, 286 days slower than North Somerset's median of 52 for discharge of conditions. Approved, as 100% of discharge of conditions here are.

56%decided within 8 weeks
100%approved
249decided in the last year

Plota live figures for discharge of conditions decided by North Somerset in the last twelve months, from validation. North Somerset decision record →

Public comments

3comments received
1 objecting1 neutral1 supporting

33% support · above the UK average of 16%

Last counted 9 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
24 Nov 2025
Env. assessment
No
North Somerset
Planning Authority Score
6.4/10
Average
#83 of 296 councils
Relevant to this application:
Householder decisions

North Somerset is faster than most councils at deciding householder applications, ranking #96 out of 296. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
North Somerset decision statistics
Based on MHCLG data, the year to March 2026
89%
Overall approval rate
Above avg (87%) #137 of 296
93%
Householder approved
Above avg (90%) #134 of 296
73%
Decided in 8 weeks
Above avg (63%) #96 of 296
34%
Extended time limit
Below avg (41%) #88 of 296
74%
Minor dwellings approved
135 decided (1-9 homes)
95%
Major dwellings approved
19 decided (10+ homes)
85%
Change of use approved
52 decided
1,139
Total decisions
128 refused in the year to March 2026