Luneside West Development Site Thetis Road Lune Business Park Lancaster Lancashire LA1 5QP Data via plota.co.uk

26/01020/S106 - Section 106 Query Awaiting decision

Proposal

& - Developer request for status of outstanding contribution amounts (No fee equiry) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
5 Oct 2026
Decision
Expected by 30 Nov 2026

Under consideration

No decision has been issued yet. A decision is expected by 30 Nov 2026.

Site constraints 6

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
National infrastructure project 1057 m away: Heysham to M6 Link Road
The site is 1057 m from the project boundary. Highway, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Nature improvement area: Morecambe Bay Limestones and Wetlands; Inside the Lancaster built-up area.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 6 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Lancaster - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Lancaster
Application type
Section 106 Query
Postcode
LA1 5QP
Received
5 Oct 2026
Validated
5 Oct 2026
Ward
Marsh Ward
Parish
Lancaster Non-Civil Parish
Case officer
Show
Target decision
30 Nov 2026
Applicant
Show

Public comments

No public comments yet.

Last counted 17 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
30 Nov 2026
Env. assessment
No
Lancaster
Planning Authority Score
5/10
Average
#147 of 296 councils
Relevant to this application:
Householder decisions

Lancaster is faster than most councils at deciding householder applications, ranking #84 out of 296. Householder applications are slightly less likely to be approved here (87%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Lancaster decision statistics
Based on MHCLG data, the year to March 2026
83%
Overall approval rate
Below avg (87%) #237 of 296
87%
Householder approved
Below avg (90%) #231 of 296
74%
Decided in 8 weeks
Above avg (63%) #84 of 296
38%
Extended time limit
Below avg (41%) #130 of 296
71%
Minor dwellings approved
45 decided (1-9 homes)
63%
Major dwellings approved
16 decided (10+ homes)
63%
Change of use approved
48 decided
717
Total decisions
122 refused in the year to March 2026