Tottonians Rugby Football Club House, Water Lane, Totton Data via plota.co.uk

26/10773 - Full Planning Permission Registered

Proposal

Installation of a new LED sports lighting system comprising six 15 metre-high lighting columns with LED luminaires, associated control equipment, electrical infrastructure and ancillary works to provide floodlighting to the existing rugby pitch. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
12 Aug 2026
✓
Validated
9 Sept 2026
✓
Consultation
11 Sept 2026
Decision
Target date was 18 Nov 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 23 Nov 2026; it is now day 75.

The consultation period closed on 3 Nov 2026.

Site constraints 2

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Also on the record
Inside the Totton built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in New Forest (District) - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Received
12 Aug 2026
Validated
9 Sept 2026
Ward
Totton North
Parish
Totton and Eling
Case officer
Show
Target decision
18 Nov 2026
Applicant
Show
Agent
Kingfisher Lighting

Decision outlook

Day 75, past the statutory target. 83% of commercial and major works in New Forest (District) are decided within thirteen weeks, which runs to 9 Dec 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 22 Nov 2026.

Day 7519 days past the 56-day target
57%decided within 8 weeks
87%approved
6%go to committee

Plota live figures for commercial and major works decided by New Forest (District) in the last twelve months, from validation. New Forest (District) decision record →

Public comments

16comments received
2 neutral14 supporting

88% support · above the UK average of 16%

50 neighbours consulted · Last counted 22 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15116208
Planning Portal ref
PP-15116208
Consultation
11 Sept 2026
Comments by
3 Nov 2026
Env. assessment
No
New Forest (District)
Planning Authority Score
7.8/10
Good
#29 of 296 overall
Relevant to this application:
Householder decisions

New Forest (District) is faster than most councils at deciding householder applications: #37 of 296 on speed. Householder applications are slightly more likely to be approved here (96%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
New Forest (District) decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #112 of 296
96%
Householder approved
Above avg (90%) #54 of 296
80%
Decided in 8 weeks
Above avg (63%) #37 of 296
35%
Extended time limit
Below avg (41%) #103 of 296
69%
Minor dwellings approved
87 decided (1-9 homes)
91%
Major dwellings approved
11 decided (10+ homes)
78%
Change of use approved
40 decided
885
Total decisions
85 refused in the year to March 2026