Land Off Bank Top Southowram Halifax Calderdale Data via plota.co.uk

22/01140/NMA - 1st Non Material Amendment Refused

Proposal

Non material amendment to ; Realignment of access 1.2m from approved position Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
21 Oct 2025
✗
Refused
25 Nov 2025
Appeal
Not lodged

Refused on 25 Nov 2025 · Delegated Decision · Last checked 11 Oct 2026

Associated applications 3

  • Part of

    Outlinecouncil archive

    Conditions 2 varied

Site constraints 8

Green belt: South and West Yorkshire
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
2 listed buildings within 150 m
Nearest: Upper Marsh Farmhouse and Attached Barn, Grade II, 33 m away · 2 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 2 with distances
Historic England ↗
Also on the record
Nature recovery project: Bradford and South Pennines; Radon affected area, class 2; Coalfield, development low risk area; Inside the Halifax built-up area; National infrastructure project 1.9 km away: Calderdale Energy Park, at pre-application; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 4, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Calderdale - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Calderdale
Application type
1st Non Material Amendment
Received
21 Oct 2025
Validated
21 Oct 2025
Ward
Halifax Town
Parish
Not In A Parish
Case officer
Show
Target decision
18 Nov 2025
Decision
Refuse
Decision date
25 Nov 2025
Decision level
Delegated Decision
Applicant
Show
Agent
Rose Consulting

Public comments

No public comments yet.

Last counted 11 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14428158
Planning Portal ref
PP-14428158
Statutory expiry
18 Nov 2025
Env. assessment
No
Calderdale
Planning Authority Score
2.7/10
Poor
#240 of 296 overall
Relevant to this application:
Householder decisions

Calderdale is #193 of 296 councils on householder decision speed. 50% of applications have the time limit extended, above the 41% national average. Householder applications are slightly less likely to be approved here (87%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Calderdale decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #192 of 296
87%
Householder approved
Below avg (90%) #229 of 296
58%
Decided in 8 weeks
Below avg (63%) #193 of 296
50%
Extended time limit
Above avg (41%) #223 of 296
73%
Minor dwellings approved
103 decided (1-9 homes)
82%
Major dwellings approved
11 decided (10+ homes)
89%
Change of use approved
61 decided
856
Total decisions
121 refused in the year to March 2026