Brynowen, Trefeglwys, Caersws, SY17 5QX Data via plota.co.uk

P/26/0976/FUL - Full planning permission Under Consultation

Proposal

Erection of an agricultural building and associated works (retrospective) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
8 Sept 2026
Decision
Expected by 3 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 9 Oct 2026, from Powys's recent agricultural works.

Site constraints 3

Agricultural land, grade 4
Poor quality farmland, not best and most versatile. Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Also on the record
Radon affected area, class 3; National infrastructure project about 1756 m away: Mid Wales Electricity Connection (N Grid).
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Powys - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Powys
Application type
Full planning permission
Postcode
SY17 5QX
Received
8 Sept 2026
Validated
8 Sept 2026
Ward
Llanbrynmair
Parish
Trefeglwys
Case officer
Show
Target decision
3 Nov 2026
Decision level
Delegated Decision
Applicant
Show

Decision outlook

Day 31, past Powys's usual 28 days for agricultural works. 81% are decided within thirteen weeks, so most likely by 8 Dec 2026.

Day 3125 days to the 56-day target
65%decided within 8 weeks
90%approved
160decided in the last year

Plota live figures for agricultural works decided by Powys in the last twelve months, from validation. Powys decision record →

Public comments

2comments received
2 neutral

Last counted 1 Oct 2026

Read the comments on the council site ↗