Hoglands Park Houndwell Place Southampton SO14 1JZ Data via plota.co.uk

25/01478/DIS - Discharge of Conditions Decided

Proposal

Application for approval of details reserved by conditions 2 (Archaeological damage-assessment), 3 (Archaeological investigation), 4 (Archaeological work programme), 5 (Sustainable drainage systems), 6 (Landscaping), 7 (Ecological mitigation statement), 8 (Flood lighting), 10 (Flood lighting anti climb collars), 11 (Construction management plan) and 12 (Trees) of planning permission ref for a skatepark. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 24 Nov 2025
✓
Split decision for discharge conditions
26 Jan 2026

Split decision for discharge conditions on 26 Jan 2026 · Delegated Decision · Last checked 11 Oct 2026

Associated applications 2

  • Part of

    FullApprovedcouncil archive

    Conditions 2, 3, 4, 5, 6, 7, 8, 10, 11, 12 decided (outcome not recorded)

    • ConditionsApplication for approval of details reserved by conditions 2 (Archaeological…This application25/01478/DIS

Site constraints 8

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Registered park or garden: Central Parks
Nationally designated heritage. Its significance and setting carry great weight.
Registered parks and gardens, battlefields, world heritage sites and protected wrecks are designated heritage assets: harm needs clear and convincing justification.
Historic England ↗
Article 4 direction
HMO. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Open access land
Open country or registered common land, with a right to roam on foot.
Building on registered common land needs the consent of the Secretary of State as well as planning permission.
Also on the record
Scheduled monument 230 m away: Town wall: section from Bargate E and including Polymond Tower; Inside the Southampton built-up area; National infrastructure project 1.5 km away: Solent Gateway 2, at pre-application.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Southampton - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Discharge of Conditions
Postcode
SO14 1JZ
Received
around 24 Nov 2025
Validated
24 Nov 2025
Ward
Bargate
Case officer
Show
Target decision
19 Jan 2026
Decision
Split decision for discharge conditions
Decision date
26 Jan 2026
Decision level
Delegated Decision
Applicant
Show

Public comments

No public comments yet.

Last counted 11 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
12199
Statutory expiry
19 Jan 2026
Env. assessment
No
Southampton
Planning Authority Score
5/10
Average
#150 of 296 overall
Relevant to this application:
Householder decisions

Southampton is #158 of 296 councils on householder decision speed. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Southampton decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #117 of 296
93%
Householder approved
Above avg (90%) #137 of 296
63%
Decided in 8 weeks
Above avg (63%) #158 of 296
40%
Extended time limit
Below avg (41%) #154 of 296
70%
Minor dwellings approved
50 decided (1-9 homes)
100%
Major dwellings approved
8 decided (10+ homes)
86%
Change of use approved
109 decided
742
Total decisions
72 refused in the year to March 2026