Thurleigh Primary School High Street Thurleigh Bedford Bedfordshire MK44 2DB Data via plota.co.uk
Proposal
Installation/ replacement of existing heating system top main school to replace old oil-fired system, with new electrically powered inverter heat pumps and air source heat pumps Data via plota.co.uk
Application progress
Under consideration
No decision has been issued yet. Plota predicts a decision around 9 Oct 2026, from Bedford's recent utility and infrastructure works.
Site constraints 6
Show all 9 with distances
- 36 mThurleigh War MemorialGrade II
- 39 m23, High StreetGrade II
- 49 mNovel HovelGrade II
- 70 mGreen HedgesGrade II
- 76 m16 and 18, High StreetGrade II
- 103 mHillside CottageGrade II
- 106 mParish Church of Saint PeterGrade II*
- 114 mChurchyard Cross Near South Door of ChurchGrade II*
- 116 mSunnysideGrade II
Checked on 6 October 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.
Building
From the energy performance certificate lodged in October 2017, the latest held for this property. The building may have changed since. View the certificate
Every application in Bedford - and every UK council - as a live feed, an API, or a bulk CSV export.
Other new applications on this street
6 High Street Thurleigh Bedford Bedfordshire MK44 2DB
Horse chestnut approx 6m tall remove as its dying and covered in ivy. Sycamore a...
Three Horseshoes High Street Swineshead Bedford Bedfordshire MK44 2AA
Chimney re-pointing.
95 High Street Riseley Bedford Bedfordshire MK44 1DF
26/00599/LBC: Condition 2 - Details of Box (Discharge of Condition)
Town Farm High Street Riseley Bedford Bedfordshire MK44 1DU
T1 - T6 x6 Conifers - Fell
Nearby new applications
6 High Street Thurleigh Bedford Bedfordshire MK44 2DB
Horse chestnut approx 6m tall remove as its dying and covered in ivy. Sycamore a...
The Beeches High Street Thurleigh Bedfordshire
24/01167/MAR- Condition 4 - Materials (Discharge of Condition)
The Beeches High Street Thurleigh Bedfordshire
24/01167/MAR- Condition 5 - Boundary Treatments (Discharge of Condition)
The Beeches High Street Thurleigh Bedfordshire
24/01167/MAR- Condition 6 - Surfacing Materials (Discharge of Condition)
Important details
Decision outlook
Day 67, past the statutory target. 91% of utility and infrastructure works in Bedford are decided within thirteen weeks, which runs to 2 Nov 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 7 Oct 2026.
Plota live figures for utility and infrastructure works decided by Bedford in the last twelve months, from validation. Bedford decision record →
Public comments
2 neighbours consulted · Last counted 7 Oct 2026
Consultation & key dates
- Alt. reference
- PP-15119477
- Planning Portal ref
- PP-15119477
- Neighbours
- 2 Oct 2026
- Consultation
- 2 Oct 2026
- Comments by
- 3 Sept 2026
- Site or press notice
- 12 Aug 2026
- Committee
- 12 Oct 2026
- Env. assessment
- No
Historical activity at this location
25 nearby applications on record - archival context, not part of the live application.
Nearby activity
Bedford is slower than most councils at deciding householder applications, ranking #201 out of 296. 52% of applications have the time limit extended, above the 41% national average. Householder applications are slightly less likely to be approved here (86%) than the national average (90%).
Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.
Track this application
Thurleigh Primary School High Street Thurleigh Bedford Bedfordshire MK44 2DB
Tracking this application
Not there in a minute? Check junk - especially Hotmail and Outlook.
Go to your dashboard →Sign in to view contact details
Applicant and case-officer names are hidden from public view for privacy. Create a free Plota account - or sign back in - and we'll show them, plus you get a dashboard for alerts and tracked applications.

A re-consultation started on 2 Oct 2026. The council has not yet published the new comment deadline.