The Dutchman Moorends Road Moorends Doncaster DN8 4JY Data via plota.co.uk

26/02129/OHL - Overhead Electricity Lines Awaiting decision

Proposal

Installation of 2 new 11 metre poles in a H-Pole configuration Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
9 Nov 2026
✓
Consultation
16 Nov 2026
Decision
Expected by 21 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 24 Dec 2026 and 3 Jan 2027, from Doncaster's recent utility and infrastructure works.

Comments are open until 7 Dec 2026

Comment on this application ↗

Site constraints 8

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
SSSI 286 m away: Thorne, Crowle and Goole Moors SSSI; Nature improvement area: Humberhead Levels; National infrastructure project 1.7 km away: Tween Bridge Solar Farm; Coalfield, development low risk area; Priority habitat 30 m away: Deciduous woodland; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 2, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 11 November 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area551 m² (5,931 sq ft)
Energy ratingC (asset rating 64)
UseA3/A4/A5 Restaurant and Cafes/Drinking Establishments and Hot Food takeaways
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in May 2018, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Doncaster - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Doncaster
Application type
Overhead Electricity Lines
Postcode
DN8 4JY
Received
9 Nov 2026
Validated
9 Nov 2026
Ward
Thorne And Moorends
Parish
Thorne Town Council
Case officer
Show
Target decision
21 Dec 2026
Applicant
Show

Decision outlook

Day 14 of the 56-day target. Doncaster usually decides utility and infrastructure works by day 48.

Day 1442 days to the 56-day target
65%decided within 8 weeks
91%approved
59decided in the last year

Plota live figures for utility and infrastructure works decided by Doncaster in the last twelve months, from validation. Doncaster decision record →

Public comments

No public comments yet.

Last counted 19 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Consultation
16 Nov 2026
Comments by
7 Dec 2026
Statutory expiry
21 Dec 2026
Env. assessment
No
Doncaster
Planning Authority Score
7.7/10
Good
#36 of 296 overall
Relevant to this application:
Householder decisions

Doncaster is one of the fastest councils in England for householder decisions: #27 of 296 on speed. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Doncaster decision statistics
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #169 of 296
94%
Householder approved
Above avg (90%) #103 of 296
83%
Decided in 8 weeks
Above avg (63%) #27 of 296
33%
Extended time limit
Below avg (41%) #75 of 296
67%
Minor dwellings approved
135 decided (1-9 homes)
93%
Major dwellings approved
27 decided (10+ homes)
90%
Change of use approved
48 decided
928
Total decisions
122 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.