Bus Depot West Chirton Industrial Estate South Norham Road North Shields Tyne And Wear NE29 7AP Data via plota.co.uk

26/01601/FUL - full planning application non major Awaiting decision

Proposal

Demolition of existing depot building and installation of new EV infrastructure inc. electrical substations, chargers, a bus wash, fuel storage and new boundary fencing and entrance and new lighting Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
16 Nov 2026
✓
Validated
19 Nov 2026
✓
Consultation
20 Nov 2026
Decision
Expected by 14 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision around 14 Jan 2027, from North Tyneside's recent commercial and major works.

Comments are open until 11 Dec 2026

Comment on this application ↗

Documents 30

All documents on the council site ↗

Site constraints 4

National infrastructure project 679 m away: A19/A1058 Coast Road Junction Improvement
The site is 679 m from the project boundary. Highway, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Radon affected area, class 2; Coalfield, development low risk area; Inside the Tynemouth built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 20 November 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in North Tyneside - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
full planning application non major
Postcode
NE29 7AP
Received
16 Nov 2026
Validated
19 Nov 2026
Ward
Chirton & Percy Main
Parish
North Shields
Case officer
Show
Target decision
14 Jan 2027
Applicant
Show
Agent
Go Ahead Group

Decision outlook

Day 4 of the 56-day target. North Tyneside usually decides commercial and major works by day 56.

Day 452 days to the 56-day target
69%decided within 8 weeks
88%approved
7%go to committee

Plota live figures for commercial and major works decided by North Tyneside in the last twelve months, from validation. North Tyneside decision record →

Public comments

No public comments yet.

12 neighbours consulted · Last counted 20 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15350109
Planning Portal ref
PP-15350109
Neighbours
20 Nov 2026
Consultation
20 Nov 2026
Comments by
11 Dec 2026
Statutory expiry
14 Jan 2027
Env. assessment
No
North Tyneside
Planning Authority Score
8.9/10
Excellent
#8 of 296 overall
Relevant to this application:
Major dwellings

North Tyneside is faster than most councils at deciding householder applications: #35 of 296 on speed. Only 25% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
North Tyneside decision statistics
Based on MHCLG data, the year to March 2026
97%
Overall approval rate
Above avg (87%) #5 of 296
97%
Householder approved
Above avg (90%) #36 of 296
81%
Decided in 8 weeks
Above avg (63%) #35 of 296
25%
Extended time limit
Below avg (41%) #31 of 296
100%
Minor dwellings approved
5 decided (1-9 homes)
83%
Major dwellings approved
6 decided (10+ homes)
91%
Change of use approved
56 decided
616
Total decisions
20 refused in the year to March 2026