The Stables Holt Lane Holt BH21 7DJ Data via plota.co.uk

P/TRT/2025/03843 - Tree Works- TPO Approved

Proposal

Front of property, T1 London Plane - Reduce branches from community hall allowing a 2 metre clearance from dwelling., Rear of property, T2 Mature Lime - Raise lower canopy to fork union. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
1 Jul 2025
✓
Approved
1 Aug 2025

Approved on 1 Aug 2025 · Delegated · Last checked 28 Oct 2026

Site constraints 7

Green belt: South West Hampshire
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
2 listed buildings within 150 m
Nearest: Church of St James, Grade II, 50 m away · 2 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 2 with distances
Historic England ↗
Also on the record
Radon affected area, class 3; Inside the Holt (Dorset) built-up area; Priority habitat 34 m away: Lowland meadows; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 1 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 2

Last sold for £1,325,000 in September 2021. Detached house, freehold.

29 September 2021£1,325,000
6 May 2005£245,650New build

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Work with planning data?

Every application in Dorset - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Dorset
Application type
Tree Works- TPO
Postcode
BH21 7DJ
Received
1 Jul 2025
Validated
1 Jul 2025
Ward
Stour and Allen Vale Ward
Parish
Holt
Case officer
Show
Decision
Tree Works - TPO - Consent
Decision date
1 Aug 2025
Decision level
Delegated

How this decision compares

Decided in 31 days from validation, 5 days slower than Dorset's median of 26 for tree works. Approved, as 95% of tree works here are.

99%decided within 8 weeks
95%approved
2,437decided in the last year

Plota live figures for tree works decided by Dorset in the last twelve months, from validation. Dorset decision record →

Consultation & key dates

Comments by
28 Jul 2025
Dorset
Planning Authority Score
7.5/10
Good
#44 of 296 councils
Relevant to this application:
Householder decisions

Dorset is faster than most councils at deciding householder applications, ranking #51 out of 296. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Dorset decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #80 of 296
95%
Householder approved
Above avg (90%) #74 of 296
78%
Decided in 8 weeks
Above avg (63%) #51 of 296
35%
Extended time limit
Below avg (41%) #102 of 296
81%
Minor dwellings approved
344 decided (1-9 homes)
85%
Major dwellings approved
40 decided (10+ homes)
76%
Change of use approved
85 decided
2,781
Total decisions
233 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.