Grundon Waste Management LTD Hydrogen Production Facility Stoke Orchard Road Bishops Cleeve Cheltenham Gloucestershire Data via plota.co.uk

26/00913/FUL - Full Application Awaiting decision

Proposal

Permanent retention of the Hydrogen Production Facility and associated infrastructure Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
20 Oct 2026
✓
Validated
18 Nov 2026
✓
Consultation
20 Nov 2026
Decision
Expected by 13 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision between 19 Jan 2027 and 27 Feb 2027, from Tewkesbury's recent commercial and major works.

Comments are open until 13 Dec 2026

Comment on this application ↗

Site constraints 3

Agricultural land, grade 3b, surveyed
Not best and most versatile land (grades 1, 2 and 3a). Source: Natural England's post-1988 ALC field survey (Bristol). Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 2; the survey is the definitive reading.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Survey report ↗
Also on the record
Inside the Bishop's Cleeve built-up area; Green belt about 20 m away: Cheltenham and Gloucester.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 21 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Tewkesbury - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Tewkesbury
Application type
Full Application
Received
20 Oct 2026
Validated
18 Nov 2026
Ward
Cleeve West
Parish
Bishops Cleeve
Case officer
Show
Target decision
13 Jan 2027
Applicant
Show

Decision outlook

Day 5 of the 56-day target. Tewkesbury usually decides commercial and major works by day 85.

Day 580 days to the predicted decision (day 85)
35%decided within 8 weeks
88%approved
26decided in the last year

Plota live figures for commercial and major works decided by Tewkesbury in the last twelve months, from validation. Tewkesbury decision record →

Public comments

No public comments yet.

1 neighbour consulted · Last counted 21 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15306602
Planning Portal ref
PP-15306602
Neighbours
20 Nov 2026
Consultation
20 Nov 2026
Comments by
13 Dec 2026
Statutory expiry
13 Jan 2027
Env. assessment
No
Tewkesbury
Planning Authority Score
3.7/10
Below average
#212 of 296 overall
Relevant to this application:
Householder decisions

Tewkesbury is #197 of 296 councils on householder decision speed. 50% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Tewkesbury decision statistics
Based on MHCLG data, the year to March 2026
89%
Overall approval rate
Above avg (87%) #144 of 296
93%
Householder approved
Above avg (90%) #139 of 296
57%
Decided in 8 weeks
Below avg (63%) #197 of 296
50%
Extended time limit
Above avg (41%) #228 of 296
69%
Minor dwellings approved
89 decided (1-9 homes)
100%
Major dwellings approved
12 decided (10+ homes)
86%
Change of use approved
37 decided
689
Total decisions
74 refused in the year to March 2026