Land Between Thorpe Bank Solar Farm And Middlefield Solar Farm A177 Durham Road Thorpe Thewles TS21 3LF Data via plota.co.uk

26/0778/FUL - Full Application Approved

Proposal

Engineering operations including the installation of underground electricity cables and associated infrastructure to connect the consented solar farms ( and ) to the approved 132kV substation at Middlefield Farm. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
22 Apr 2026
✓
Consultation
12 Jun 2026
✓
Approved
17 Jun 2026

Approved on 17 Jun 2026 · Delegated Decision · Last checked 6 Sept 2026

Associated applications 4

  • Part of

    VariationApprovedcouncil archive
    • FullEngineering operations including the installation of underground electricity cables…This application26/0778/FUL
  • FullApprovedcouncil archive

    Conditions 2, 12, 13, 18 varied

Site constraints 4

Nutrient neutrality catchment: Teesmouth and Cleveland Coast SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project about 824 m away: Byers Gill Solar
The site is about 824 m from the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: East Coast Hydrogen Teesside Pipeline (at pre-application, about 170 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Priority habitat about 9 m away: Traditional orchard.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Stockton-on-Tees - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Application
Postcode
TS21 3JN
Received
22 Apr 2026
Validated
22 Apr 2026
Ward
Northern Parishes
Parish
Grindon & Thorpe Thewles Parish Council
Case officer
Show
Target decision
17 Jun 2026
Decision
Approved with Conditions
Decision date
17 Jun 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Pegasus Group

How this decision compares

Decided in 56 days from validation, 13 days slower than Stockton-on-Tees's median of 43 for utility and infrastructure works. Approved, as 98% of utility and infrastructure works here are.

86%decided within 8 weeks
98%approved
81decided in the last year

Plota live figures for utility and infrastructure works decided by Stockton-on-Tees in the last twelve months, from validation. Stockton-on-Tees decision record →

Public comments

No public comments yet.

38 neighbours consulted · Last counted 6 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14452595
Planning Portal ref
PP-14452595
Neighbours
11 May 2026
Consultation
12 Jun 2026
Comments by
3 Jul 2026
Site or press notice
5 May 2026
Statutory expiry
17 Jun 2026
Env. assessment
No
Stockton-on-Tees
Planning Authority Score
5.8/10
Average
#112 of 296 councils
Relevant to this application:
Householder decisions

Stockton-on-Tees ranks #180 out of 296 councils for householder decision speed. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Stockton-on-Tees decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #67 of 296
97%
Householder approved
Above avg (90%) #44 of 296
61%
Decided in 8 weeks
Below avg (63%) #180 of 296
40%
Extended time limit
Below avg (41%) #155 of 296
79%
Minor dwellings approved
19 decided (1-9 homes)
82%
Major dwellings approved
11 decided (10+ homes)
86%
Change of use approved
44 decided
612
Total decisions
41 refused in the year to March 2026