Penzance Railway Station Wharf Road Penzance Cornwall TR18 2LT Data via plota.co.uk

PA25/09532 - Rail Prior Notification Approved

Proposal

Prior notification for rail development, namely a replacement roof lantern Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 18 Dec 2025
✓
Approved
21 Jan 2026

Approved on 21 Jan 2026 · Peer Sign Off · Last checked 5 Oct 2026

Site constraints 5

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Penzance conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Radon affected area, class 6
An estimated 30% or more of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
4 listed buildings within 150 m; Inside the Penzance built-up area.
Not affected
Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area328 m² (3,531 sq ft)
Energy ratingE (asset rating 117)
UseB1 Offices and Workshop businesses
HeatingAir Conditioning

From the energy performance certificate lodged in April 2019, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Cornwall - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Cornwall
Application type
Rail Prior Notification
Postcode
TR18 2LT
Received
around 18 Dec 2025
Validated
18 Dec 2025
Ward
Penzance East
Parish
Penzance
Case officer
Show
Target decision
12 Feb 2026
Decision
Prior approval not req'd(PA/AF/TEL/DEM/)
Decision date
21 Jan 2026
Decision level
Peer Sign Off
Applicant
Show

How this decision compares

Decided in 34 days from validation, 9 days slower than Cornwall's median of 25 for prior approvals. Approved, as 80% of prior approvals here are.

96%decided within 8 weeks
80%approved
679decided in the last year

Plota live figures for prior approvals decided by Cornwall in the last twelve months, from validation. Cornwall decision record →

Public comments

No public comments yet.

Last counted 5 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
12 Feb 2026
Env. assessment
No
Cornwall
Planning Authority Score
7.9/10
Good
#28 of 296 overall
Relevant to this application:
Householder decisions

Cornwall is faster than most councils at deciding householder applications: #64 of 296 on speed. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Cornwall decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #79 of 296
97%
Householder approved
Above avg (90%) #28 of 296
76%
Decided in 8 weeks
Above avg (63%) #64 of 296
35%
Extended time limit
Below avg (41%) #101 of 296
82%
Minor dwellings approved
1180 decided (1-9 homes)
94%
Major dwellings approved
67 decided (10+ homes)
93%
Change of use approved
194 decided
4,839
Total decisions
363 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.