Bridge Community Farms Mill Lane Great Sutton Ellesmere Port CH66 3NE Data via plota.co.uk

Awaiting decision 26/02926/FUL
Council
Date received
15 Sept 2026
Date validated
2 Oct 2026
Postcode
CH66 3NE

Description

Full planning application for the permanent retention of all existing structures including polytunnels, cafe/office building, classrooms, ancillary structures and use of land for the continued charity/community horticultural use as well as wider non-horticultural charity/ community use of buildings and land. Data via plota.co.uk

Last checked

Decision outlook

Plota predicts a decision around 25 Nov 2026, from Chester's recent full applications.

Day 7 of the 56-day target. Chester usually decides full applications by day 54.

Day 749 days to the 56-day target
60%decided within 8 weeks
94%approved
634decided in the last year

Plota live figures for full applications decided by Chester in the last twelve months, from validation. Chester decision record →

Site constraints 2

Also on the record
National infrastructure project about 740 m away: Mersey Tidal Power Project, at pre-application; Inside the Ellesmere Port built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 7 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Chester - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service