Cwrt-y-Gollen Camp Deans Drive Cwrt Y Gollen Crickhowell Powys NP8 1TH Data via plota.co.uk

26/24861/FUL - Full Application Awaiting decision

Proposal

Proposed Ablution Block Extension Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 19 Aug 2026
Decision
Expected by 14 Oct 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 13 Oct 2026 and 2 Nov 2026, from Brecon Beacons's recent extensions.

Documents 45

All documents on the council site ↗

Site constraints 7

Nutrient neutrality catchment: River Usk
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Brecon Beacons National Park
The park authority decides applications here. Great weight to conserving the landscape; major development restricted.
Landscape, scenic beauty and wildlife carry great weight, and major development is only allowed in exceptional circumstances.
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
Special area of conservation about 390 m away: River Usk / Afon Wysg; Scheduled monument about 222 m away: Cwrt-y-Gollen Standing Stone; SSSI about 390 m away: River Usk (Upper Usk) / Afon Wysg (Wysg Uchaf).
Not affected
Outside flood zones 2 and 3

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Brecon Beacons - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Application
Postcode
NP8 1TH
Received
around 19 Aug 2026
Validated
19 Aug 2026
Case officer
Show
Applicant
Show
Agent
LPC (Trull) Ltd

Decision outlook

Day 51 of the 56-day target. Brecon Beacons usually decides extensions by day 57.

Day 516 days to the predicted decision (day 57)
47%decided within 8 weeks
88%approved
83decided in the last year

Plota live figures for extensions decided by Brecon Beacons in the last twelve months, from validation. Brecon Beacons decision record →

Public comments

No public comments yet.

Last counted 1 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Env. assessment
No