104 homes at Land To The East Of Daleside, Cross Lane, Sacriston
Summary of planning committee decision
Decided by Durham County Planning Committee on 1 Apr 2026.
What was proposed
The application sought 104 homes with access, infrastructure, landscaping and diversion of Footpath 6, including 16 affordable homes.
“Proposal: Erection of 104no. dwellings (use class C3) and associated access, infrastructure and landscaping including the proposed diversion of footpath 6”
“The development would build on successful phases of the development of the site and boost housing land supply resulting in significant benefits from the delivery of housing at a time where the Council cannot demonstrate a 5-year housing land supply. Significant social and economic benefits would also arise through the provision of 16 affordable housing units including accessible bungalows to meet specific needs. 8.”
Officer report
The site and surroundings
The six-hectare greenfield site was agricultural land north of Sacriston, beside housing, woodland, a watercourse, a sewage works and open fields.
“The site is bounded by: - Woodland, Black Burn watercourse and a sewage treatment works (STW) to the east - Nettlesworth West House Farm to the northwest - Open agricultural fields to the north - Existing housing to the south and west - An Area of Higher Landscape Value (AHLV) immediately adjoins the site along its northeastern edge (running alongside the proposed grassland buffer)”
“The built development site comprises two agricultural fields, with tree and hedgerow cover primarily limited to field edges. The site includes two balancing ponds associated with earlier phases of the development. The land levels typically fall from west to east. The site partially extends into the field to the north, in the form of a buffer zone to the woodland and adjacent retained arable field. 14. A public right of way (Footpath no.”
Officer report
Earlier development phases
Earlier permissions provided 84 homes in full and 116 in outline, with both phases now built and occupied; drainage infrastructure was also installed.
“The initial hybrid application (DM/15/03019/OUT), was approved in April 2018. Consent was granted for 84 dwellings in full (Phase 1) and 116 dwellings in outline form (Phase 2). The subsequent reserved matters application (DM/19/01172/RM) for 116 dwellings was approved in October 2019. Some drainage infrastructure has been constructed within the current application site which forms Phase 3 of the wider development. Both Phase 1 and 2 are fully built out and occupied.”
Officer report
What consultees said
Most consultees raised no objection subject to conditions or contributions, while the parish council remained concerned about traffic, services, open-space management and the footpath diversion.
“Coal Authority – Raise no objection subject to conditions relating to the completion of remedial works prior to the commencement of development and those works being signed off by a competent person. 29.”
“Highway Authority (Integrated Passenger Transport) – Whilst 400m is the aspirational walking distance to access public transport, diversion of any existing bus services to improve accessibility is non-viable. Existing services provide suitable coverage and links. Request existing footways between the development site and bus stops are upgraded to benefit from dropped kerbs. 43.”
Officer report
What residents said
Thirteen objections cited overdevelopment, traffic, construction disturbance, infrastructure pressure, drainage, landscape, ecology, affordable housing and management concerns.
“Highways/PROW • Increase in traffic and impact to local road network capacity. • Construction traffic would need to access through an existing residential area. • Lack of improvements to the wider pedestrian network. • There are no traffic signs to indicate the estate falls within a 20mph zone. • Impact to PROW through its proposed diversion. • Impact arising from the proposed new path to the rear of Daleside.”
“Drainage • Development of greenfield site raises concerns about surface water management and flood risk. • Poor drainage within the site. • A culvert runs through the site. • Existing residents note drainage is an issue in terms of foul drainage due to the flushing of wet wipes and flooded gardens.”
Officer report
Who addressed the committee
A parish council representative, the local member and the applicant’s representative addressed members about local impacts, contributions, housing need and scheme changes.
The committee vote
A motion to approve was proposed and seconded, with members describing the scheme as reasonable, well related to the settlement and beneficial overall.
“Councillor Wilkes confirmed that despite the issue with the bus stops, it was not a sufficient reason to refuse the application. He noted that issues that he had raised with previous developments such as tandem parking, had been reasonably dealt with, but requested that discussions were had with regards to Council management of the site.”
“Councillor Wilkes moved the recommendation as on balance this was a reasonable application and the Council had an obligation to meet housing targets. Councillor Stephenson seconded the motion to approve the application. Whilst it was a shame to lose agricultural land and connections to bus stops were not ideal, this was a good project with plenty of open green spaces and little landscape harm. It was well related to the settlement, with good transport links.”
Minutes
The decision
The application was approved subject to the stated conditions and a legal agreement securing affordable housing, education, healthcare, open-space, footpath, SSSI and biodiversity contributions.
“That the application be APPROVED, subject to the conditions outlined in the report, and a legal agreement under S106 of the Town and Country Planning Act 1990 (as amended) to secure the following;”
“15% of Affordable housing on-site comprising 11no. Affordable Rent units (comprising 7no. 2 bed and 4no. 3 bed) and 5no. Discount Market Sale units (comprising 5no. 2 bed); • £123,739 contribution toward increasing Nursery / Early Years capacity; • £83,980 contribution toward increasing capacity at SEND schools across the County; • £50,232 contribution toward increasing NHS GP surgery capacity; • £46,487 contribution toward improving public open spaces; • £2,500…”
Minutes
Sources
- Durham County Planning Committee minutes, 1 April 2026
- Agenda and papers (council website)
Source: Plota analysis of Durham's committee minutes and officer report. Quotations are the council's own words; headings and summaries are Plota's.
Committee decisions and nationwide planning applications, in one API
The Plota API returns planning applications from every council we cover, each with its decision, whether a committee or officers decided it, and the committee date. Build it into your own tools.
See the API →At the meeting
- Committee
- Durham County Planning Committee
- Council
- Durham
- Date
- Wednesday 1 April 2026
- Recommendation
- Officers recommended approval
- Committee decided
- Approved
- Minutes
- The council's minutes
- Meeting
- Agenda and papers (council website)
- Application
- View application →
- All decisions
- Durham committee decisions →
This committee's year
21 decisions in the 12 months to this meeting, 3 against officer advice.
Source: Plota analysis of the committee's minutes.