52 Gallowtree Gate, outside GAME Shop Data via plota.co.uk

20251338 - Operational development - full application Refused

Proposal

Installation of telephone kiosk Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
12 Aug 2025
✓
Validated
13 Aug 2025
✗
Refused
8 Oct 2025
✗
Appeal dismissed
5 Mar 2026

Refused on 8 Oct 2025 · Delegated · Last checked 14 Oct 2026

Site constraints 5

Air quality management area: Leicester AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
24 listed buildings within 150 m of the postcode pin
Nearest: Four bollards at Victoria Parade, Grade II, about 29 m from the postcode pin · 1 Grade II*, 22 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 24 with distances
Historic England ↗
Conservation area about 18 m away: Market Place
The edge of the area; work outside it can still affect its setting.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Also on the record
Heritage at risk about 18 m away: Market Place, Leicester; Inside the Leicester built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Leicester - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Leicester
Application type
Operational development - full application
Received
12 Aug 2025
Validated
13 Aug 2025
Ward
Castle
Case officer
Show
Target decision
7 Oct 2025
Decision
Refusal
Decision date
8 Oct 2025
Decision level
Delegated
Appeal
Dismissed · 5 Mar 2026 · Written Representations · Inspectorate case 6001613 ↗

How this decision compares

Decided in 56 days from validation, about the council's usual 55 days. Refused, as 98% of full applications here are.

73%decided within 8 weeks
2%approved
928decided in the last year

Plota live figures for full applications decided by Leicester in the last twelve months, from validation. Leicester decision record →

Consultation & key dates

Planning Portal ref
MND6945
Consultation
4 Sept 2025
Comments by
7 Oct 2025
Site or press notice
4 Sept 2025
Leicester
Planning Authority Score
2.2/10
Poor
#267 of 296 overall
Relevant to this application:
Householder decisions

Leicester is slower than most councils at deciding householder applications: #232 of 296 on speed. 48% of applications have the time limit extended, above the 41% national average. Householder applications are slightly less likely to be approved here (85%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Leicester decision statistics
Based on MHCLG data, the year to March 2026
82%
Overall approval rate
Below avg (87%) #249 of 296
85%
Householder approved
Below avg (90%) #250 of 296
51%
Decided in 8 weeks
Below avg (63%) #232 of 296
48%
Extended time limit
Above avg (41%) #215 of 296
68%
Minor dwellings approved
85 decided (1-9 homes)
100%
Major dwellings approved
17 decided (10+ homes)
62%
Change of use approved
85 decided
1,069
Total decisions
195 refused in the year to March 2026