Bankside Yards (BY6) 64 Hopton Street London Southwark SE1 9JH Data via plota.co.uk

25/AP/2894 - Variation Awaiting decision

Proposal

Non-material amendment to planning permission (BY6) dated 22/12/2020 for 'Redevelopment to create two levels of basement and the erection of five buildings ranging from seven to 34 storeys plus plant (heights ranging from 28.9m AOD 123.9m AOD) to provide: 341 dwellings (Class C3); 8,054sqm (GIA) of office space (Class B1); 1,436sqm (GIA) of retail floorspace (Class A1-A4); 904sqm (GIA) of cultural floorspace (Class D1/D2); 16,254sqm (GIA) hotel with up to 126 rooms (Class C1); new open space; reconfigured vehicular and pedestrian access; highway works; landscaping; basement car park for 107 cars (including 29 disabled car parking spaces), plus servicing and plant areas; and works associated and ancillary to the proposed development'. The amendments include the following: - Provision of an additional stair within the building introduced in order to accommodate a second staircase which reflects latest government guidance on fire safety. This necessitates the slight widening of the tower element above the podium by circa 3m retaining the same relationship with adjoining buildings and the public open space to the north. - In order to reconcile the loss of floorspace through the building with the additional staircase, it is proposed to add a floor to the podium and a further two floors to the tower building. - As a result of the additional floors, the quantum and mix of the residential units has changed as follows; - The consented scheme included 165 market units and 15 shared ownership units. - The proposed scheme comprises 173 market units and 26 social rented units. This has been progressed on the basis that the proposed scheme seeks to improve the affordable housing ratio within the building by securing 30% of the uplift in habitable room above the consented scheme for social rented housing. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
7 Oct 2025
✓
Validated
17 Oct 2025
Decision
Target date was 13 Nov 2025

Under consideration

No decision has been issued yet. The council's target date, 13 Nov 2025, has passed.

Documents 44

Plans & drawings 28

PDF 1370-A-SH7-1700 REV 2 PROPOSED GROUND FLOOR PLAN Plan - Amended · 10 Feb 2026 View ↗ PDF 1370-A-SH7-1709 REV 2 PROPOSED PLAN LEVEL 9 Plan - Amended · 10 Feb 2026 View ↗ PDF 1370-A-SH7-0997 REV 3 LEVEL B2 PLAN Plan - Amended · 10 Feb 2026 View ↗ PDF 1370-A-SH-1034 REV 3 PROPOSED ROOF PLAN Plan - Proposed · 17 Oct 2025 View ↗ PDF 1370-A-SH-1008 REV 2 PROPOSED LEVEL 09 PLAN Plan - Proposed · 17 Oct 2025 View ↗ PDF 1370-PLP-SH-1000 REV 2 PROPOSED GROUND FLOOR PLAN Plan - Proposed · 17 Oct 2025 View ↗ PDF 1370-A-BY7-2700 REV 1 PROPOSED NORTH AND EAST ELEVATION Plan - Proposed · 17 Oct 2025 View ↗ PDF 1370-A-SH7-1700 REV 1 PROPOSED GROUND FLOOR PLAN Plan - Superseded · 17 Oct 2025 View ↗ PDF 1370-A-SH-2002 REV 2 PROPOSED SITE ELEVATION EAST Plan - Proposed · 17 Oct 2025 View ↗ PDF 1370-A-SH7-1710 REV 1 PROPOSED TYPICAL PLAN LEVEL 10-13 Plan - Proposed · 17 Oct 2025 View ↗ PDF 1370-A-SH7-1724 REV 1 PROPOSED TYPICAL PLAN LEVEL 24-31 Plan - Proposed · 17 Oct 2025 View ↗ PDF 1370-A-SH7-1703 REV 1 PROPOSED PLAN LEVEL 3-6 Plan - Proposed · 17 Oct 2025 View ↗ PDF 1370-A-BY7-2701 REV 1 PROPOSED WEST AND SOUTH ELEVATION Plan - Proposed · 17 Oct 2025 View ↗ PDF 1370-A-SH7-1708 REV 1 PROPOSED PLAN LEVEL 08 Plan - Proposed · 17 Oct 2025 View ↗ PDF 1370-A-SH7-3700 REV 2 PROPOSED FACADE TYPE A Plan - Proposed · 17 Oct 2025 View ↗ PDF 1370-A-SH7-1733 REV 1 PROPOSED PLAN LEVEL 33 Plan - Proposed · 17 Oct 2025 View ↗ PDF 1370-A-SH-1020 REV 3 PROPOSED LEVEL 20 PLAN Plan - Proposed · 17 Oct 2025 View ↗ PDF 1370-A-SH-1001 REV 2 PROPOSED GROUND FLOOR PLAN Plan - Proposed · 17 Oct 2025 View ↗ PDF 1370-A-SH7-1701 REV 1 PROPOSED PLAN LEVEL 1 Plan - Proposed · 17 Oct 2025 View ↗ PDF 1370-A-SH-2003 REV 2 PROPOSED SITE ELEVATION WEST Plan - Proposed · 17 Oct 2025 View ↗ PDF 1370-A-SH-2001 REV 2 PROPOSED SITE ELEVATION SOUTH Plan - Proposed · 17 Oct 2025 View ↗ PDF 1370-A-SH7-1709 REV 1 PROPOSED PLAN LEVEL 9 Plan - Superseded · 17 Oct 2025 View ↗ PDF 1370-A-SH7-1714 REV 1 PROPOSED TYPICAL PLAN LEVEL 14-23 Plan - Proposed · 17 Oct 2025 View ↗ PDF 1370-A-BY7-2750 REV 1 PROPOSED SECTION Plan - Proposed · 17 Oct 2025 View ↗ PDF 1370-A-SH7-1702 REV 1 PROPOSED PLAN LEVEL 2 Plan - Proposed · 17 Oct 2025 View ↗ PDF 1370-A-SH7-1707 REV 1 PROPOSED PLAN LEVEL 7 Plan - Proposed · 17 Oct 2025 View ↗ PDF 1370-A-SH7-1732 REV 1 PROPOSED PLAN LEVEL 32 Plan - Proposed · 17 Oct 2025 View ↗ PDF 1370 A SH 2002 REV 2 PROPOSED SITE ELEVATION EAST Plan - Proposed · 7 Oct 2025 View ↗

All documents on the council site ↗

Associated applications 4

Site constraints 12

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
3 Article 4 directions
Site allocation NSP19: Ludgate House & Sampson House, 64 Hopton Street · Bankside and Borough District Town Centre · Central Activities Zone. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
National infrastructure project: Thames Tideway Tunnel
The site is inside the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, the site is inside its boundary).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Southwark AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: Bankside and The Borough
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
4 listed buildings within 150 m; Tree preservation order 11 m away: Falcon Point, O/S Founder’s Arms Public House, 52 HOPTON STREET LONDON SE1 9JH; Inside the Southwark built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square.
Not affected
Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Southwark - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Southwark
Application type
Variation
Postcode
SE1 9JH
Received
7 Oct 2025
Validated
17 Oct 2025
Ward
Borough & Bankside
Parish
Borough, Bankside And Walworth
Target decision
13 Nov 2025
Agent
DP9 Limited

Public comments

No public comments yet.

Last counted 16 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
13 Nov 2025
Env. assessment
No
Southwark
Planning Authority Score
7/10
Good
#64 of 296 overall
Relevant to this application:
Major dwellings

Southwark is faster than most councils at deciding householder applications: #54 of 296 on speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Southwark decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #93 of 296
95%
Householder approved
Above avg (90%) #92 of 296
78%
Decided in 8 weeks
Above avg (63%) #54 of 296
37%
Extended time limit
Below avg (41%) #122 of 296
92%
Minor dwellings approved
259 decided (1-9 homes)
86%
Major dwellings approved
14 decided (10+ homes)
82%
Change of use approved
38 decided
1,622
Total decisions
132 refused in the year to March 2026