LA04/2025/1189/LBC - Listed Building Consent Consultation Open

Proposal

Internal and external alterations to facilitate proposed change of use from restaurant and office foyer at ground floor and offices at first to fifth floor to 31 no. unit aparthotel and café. Works also include additional roof plant. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
11 Jul 2025
✓
Consultation
1 Jul 2026
Decision
Target date was 5 Sept 2025

Under consideration

No decision has been issued yet. Plota predicted a decision around 19 Nov 2026; it is now day 496.

A re-consultation started on 1 Jul 2026. The council has not yet published the new comment deadline.

Documents 197

Plans & drawings 111

PDF Existing 1st floor Ceiling Plan_24-194-P11A Detailed Drawing Plans · 1 Jul 2026 View ↗ PDF Existing Floor Plans-Demolitions_24-194-P04B Detailed Drawing Plans · 1 Jul 2026 View ↗ PDF Existing Roof Plan Section A-A Elevations-Demolitions_24-194-P05B Detailed Drawing Plans · 1 Jul 2026 View ↗ PDF Door and Panel Relocation_24-194-P12A Detailed Drawing Plans · 1 Jul 2026 View ↗ PDF Proposed Floor Plans_24-194-P06D Floor Plans · 1 Jul 2026 View ↗ PDF Ground Floor Plan_LBC_24-194-101D Floor Plans · 1 Jul 2026 View ↗ PDF Right Elevation_LBC_24-194-113C Proposed Elevations · 1 Jul 2026 View ↗ PDF Side Elevation_LBC_24-194-112B Proposed Elevations · 1 Jul 2026 View ↗ PDF Front Elevation_LBC_24-194-111B Proposed Elevations · 1 Jul 2026 View ↗ PDF Proposed Roof Section A-A Elevations_24-194-P07E Roof Details · 1 Jul 2026 View ↗ PDF Building Control Drawings 2001 Application Other Supporting Information · 15 Apr 2026 View ↗ PDF Building Control Drawings Fp 2009 1365 Other Supporting Information · 15 Apr 2026 View ↗ PDF Building Control Drawings Fp 2009 1665 Other Supporting Information · 15 Apr 2026 View ↗ PDF Building Control Drawings Fp 2015 1968 Other Supporting Information · 15 Apr 2026 View ↗ PDF Building Control Original Drawings 1 Other Supporting Information · 15 Apr 2026 View ↗ PDF Building Control Original Drawings 2 Other Supporting Information · 15 Apr 2026 View ↗ PDF Building Control Drawings 1998 Application Other Supporting Information · 15 Apr 2026 View ↗ PDF Fifth Floor Plan Lbc 24 194 106b Other Supporting Information · 15 Apr 2026 View ↗ PDF First Floor Plan Lbc 24 194 102a Other Supporting Information · 15 Apr 2026 View ↗ PDF Fourth Floor Plan Lbc 24 194 105a Other Supporting Information · 15 Apr 2026 View ↗ PDF Front Elevation Lbc 24 194 111a Other Supporting Information · 15 Apr 2026 View ↗ PDF Existing 1st Floor Ceiling Plan 24 194 P11 Other Supporting Information · 15 Apr 2026 View ↗ PDF Existing Floor Plans Demolitions 24 194 P04a Other Supporting Information · 15 Apr 2026 View ↗ PDF Existing Roof Plan Section A A Elevations Demolitions 24 194 P05a Other Supporting Information · 15 Apr 2026 View ↗ PDF Ground Floor Plan Lbc 24 194 101c Other Supporting Information · 15 Apr 2026 View ↗ PDF Roof Plan Lbc 24 194 107a Other Supporting Information · 15 Apr 2026 View ↗ PDF Second Floor Plan Lbc 24 194 103a Other Supporting Information · 15 Apr 2026 View ↗ PDF Section A A Lbc 24 194 108a Other Supporting Information · 15 Apr 2026 View ↗ PDF Section B B Lbc 24 194 109a Other Supporting Information · 15 Apr 2026 View ↗ PDF Side Elevation Lbc 24 194 112a Other Supporting Information · 15 Apr 2026 View ↗ PDF Site Layout 24 194 150a Other Supporting Information · 15 Apr 2026 View ↗ PDF Smoke Shaft Trimming Structural Layouts And Details Lbc 0925 S05 Other Supporting Information · 15 Apr 2026 View ↗ PDF Steelwork Layouts Details Part Fifth Floor And Roof Level Lbc 0925 S01a Other Supporting Information · 15 Apr 2026 View ↗ PDF Steelwork Layouts Me Plant Deck And Section Lbc 0925 S02a Other Supporting Information · 15 Apr 2026 View ↗ PDF Steelwork Layouts Me Plant Deck Rear Single Storey Roof Lbc 0925 S03a Other Supporting Information · 15 Apr 2026 View ↗ PDF Structural Layouts Me Vertical Duct Through Floors Lbc 0925 S04 Other Supporting Information · 15 Apr 2026 View ↗ PDF Third Floor Plan Lbc 24 194 104a Other Supporting Information · 15 Apr 2026 View ↗ PDF Proposed Floor Plans 24 194 P06c Other Supporting Information · 15 Apr 2026 View ↗ PDF Proposed Roof Section A A Elevations 24 194 P07d Other Supporting Information · 15 Apr 2026 View ↗ PDF Right Elevation Lbc 24 194 113b Other Supporting Information · 15 Apr 2026 View ↗ PDF Site Layout 24 194 150a (1) Other Supporting Information · 15 Apr 2026 View ↗ PDF Front Elevation_LBC_24-194-111A Proposed Elevations · 15 Apr 2026 View ↗ PDF Ground Floor Plan_LBC_24-194-101C Proposed Floor Plans · 15 Apr 2026 View ↗ PDF Proposed Floor Plans_24-194-P06C Proposed Floor Plans · 15 Apr 2026 View ↗ PDF Section A-A_LBC_24-194-108A Cross Sections · 14 Apr 2026 View ↗ PDF Section B-B_LBC_24-194-109A Cross Sections · 14 Apr 2026 View ↗ PDF Side Elevation_LBC_24-194-112A Proposed Elevations · 14 Apr 2026 View ↗ PDF Second Floor Plan_LBC_24-194-103A Proposed Floor Plans · 14 Apr 2026 View ↗ PDF Third Floor Plan_LBC_24-194-104A Proposed Floor Plans · 14 Apr 2026 View ↗ PDF Fifth Floor Plan_LBC_24-194-106B Proposed Floor Plans · 14 Apr 2026 View ↗ PDF First Floor Plan_LBC_24-194-102A Proposed Floor Plans · 14 Apr 2026 View ↗ PDF Fourth Floor Plan_LBC_24-194-105A Proposed Floor Plans · 14 Apr 2026 View ↗ PDF Roof Plan_LBC_24-194-107A Roof Details · 14 Apr 2026 View ↗ PDF Proposed Side Elevation_LBC_24-194-112A Proposed Elevations · 1 Oct 2025 View ↗ PDF Proposed Ground Floor Plan_LBC_24-194-101A Proposed Floor Plans · 1 Oct 2025 View ↗ PDF Site Location Map Site Location Plan · 21 Jul 2025 View ↗ PDF Proposed Section A-A - LBC Cross Sections · 21 Jul 2025 View ↗ PDF Proposed Section B-B - LBC Cross Sections · 21 Jul 2025 View ↗ PDF Ground Floor Plan - LBC Details Existing Elevations · 21 Jul 2025 View ↗ PDF Existing Roof Plan - Section AA , Elevations & Demolitions Existing Elevations · 21 Jul 2025 View ↗ PDF Existing Roof Plan - Section AA , Elevations Existing Elevations · 21 Jul 2025 View ↗ PDF Existing Floor Plans - Demolitions Existing Floor Plans · 21 Jul 2025 View ↗ PDF Existing Floor Plans Existing Floor Plans · 21 Jul 2025 View ↗ PDF Fifth Floor Proposed AHU and Heat Recovery Installation_LBC_M30 Existing Floor Plans · 21 Jul 2025 View ↗ PDF Fifth Floor Proposed General Extract and Gas Supression_LBC_M24 Existing Floor Plans · 21 Jul 2025 View ↗ PDF Fifth Floor Proposed Heating Installation_LBC_M06 Existing Floor Plans · 21 Jul 2025 View ↗ PDF Fifth Floor Proposed Plumbing Installation_LBC_M12 Existing Floor Plans · 21 Jul 2025 View ↗ PDF Fifth Floor Proposed Soils Waste Gas Installation_LBC_M18 Existing Floor Plans · 21 Jul 2025 View ↗ PDF First Floor Proposed AHU and Heat Recovery Installation_LBC_M26 Existing Floor Plans · 21 Jul 2025 View ↗ PDF First Floor Proposed General Extract and Gas Supression_LBC_M20 Existing Floor Plans · 21 Jul 2025 View ↗ PDF First Floor Proposed Heating Installation_LBC_M02 Existing Floor Plans · 21 Jul 2025 View ↗ PDF First Floor Proposed Plumbing Installation_LBC_M08 Existing Floor Plans · 21 Jul 2025 View ↗ PDF First Floor Proposed Soils Waste Gas Installation_LBC_M14 Existing Floor Plans · 21 Jul 2025 View ↗ PDF Fourth Floor Proposed AHU and Heat Recovery Installation_LBC_M29 Existing Floor Plans · 21 Jul 2025 View ↗ PDF Fourth Floor Proposed General Extract and Gas Supression_LBC_M23 Existing Floor Plans · 21 Jul 2025 View ↗ PDF Fourth Floor Proposed Heating Installation_LBC_M05 Existing Floor Plans · 21 Jul 2025 View ↗ PDF Fourth Floor Proposed Plumbing Installation_LBC_M11 Existing Floor Plans · 21 Jul 2025 View ↗ PDF Fourth Floor Proposed Soils Waste Gas Installation_LBC_M17 Existing Floor Plans · 21 Jul 2025 View ↗ PDF Ground Floor Proposed AHU and Heat Recovery Installation_LBC_M25 Existing Floor Plans · 21 Jul 2025 View ↗ PDF Ground Floor Proposed General Extract and Gas Supression_LBC_M19 Existing Floor Plans · 21 Jul 2025 View ↗ PDF Ground Floor Proposed Heating Installation_LBC_M01 Existing Floor Plans · 21 Jul 2025 View ↗ PDF Ground Floor Proposed Plumbing Installation_LBC_M07 Existing Floor Plans · 21 Jul 2025 View ↗ PDF Ground Floor Proposed Soils Waste Gas Installation_LBC_M13 Existing Floor Plans · 21 Jul 2025 View ↗ PDF Second Floor Proposed AHU and Heat Recovery Installation_LBC_M27 Existing Floor Plans · 21 Jul 2025 View ↗ PDF Second Floor Proposed General Extract and Gas Supression_LBC_M21 Existing Floor Plans · 21 Jul 2025 View ↗ PDF Second Floor Proposed Heating Installation_LBC_M03 Existing Floor Plans · 21 Jul 2025 View ↗ PDF Second Floor Proposed Plumbing Installation_LBC_M09 Existing Floor Plans · 21 Jul 2025 View ↗ PDF Second Floor Proposed Soils Waste Gas Installation Existing Floor Plans · 21 Jul 2025 View ↗ PDF Third Floor Proposed AHU and Heat Recovery Installation Existing Floor Plans · 21 Jul 2025 View ↗ PDF Third Floor Proposed General Extract and Gas Supression Existing Floor Plans · 21 Jul 2025 View ↗ PDF Third Floor Proposed Heating Installation Existing Floor Plans · 21 Jul 2025 View ↗ PDF Third Floor Proposed Plumbing Installation Existing Floor Plans · 21 Jul 2025 View ↗ PDF Third Floor Proposed Soils Waste Gas Installation Existing Floor Plans · 21 Jul 2025 View ↗ PDF Proposed Front Elevation - LBC Proposed Elevations · 21 Jul 2025 View ↗ PDF Proposed Rear Elevation - LBC Proposed Elevations · 21 Jul 2025 View ↗ PDF Proposed Side Elevation_LBC_24-194-112 Proposed Elevations · 21 Jul 2025 View ↗ PDF Proposed Roof Plan - Section AA , Elevations Proposed Elevations · 21 Jul 2025 View ↗ PDF Fifth Floor Plan - LBC Details Proposed Floor Plans · 21 Jul 2025 View ↗ PDF First Floor Plan - LBC Details Proposed Floor Plans · 21 Jul 2025 View ↗ PDF Fourth Floor Plan - LBC Details Proposed Floor Plans · 21 Jul 2025 View ↗ PDF Proposed Floor Plans Proposed Floor Plans · 21 Jul 2025 View ↗ PDF Proposed Roof Alteration Proposed Floor Plans · 21 Jul 2025 View ↗ PDF Proposed Third Floor Plan_LBC_24-194-104 Proposed Floor Plans · 21 Jul 2025 View ↗ PDF Second Floor Plan - LBC Details_24-194-LB-03 Proposed Floor Plans · 21 Jul 2025 View ↗ PDF Third Floor Plan - LBC Details_24-194-LB-04 Proposed Floor Plans · 21 Jul 2025 View ↗ PDF Proposed Second Floor Plan - LBC Proposed Floor Plans · 21 Jul 2025 View ↗ PDF Proposed Ground Floor Plan - LBC Proposed Floor Plans · 21 Jul 2025 View ↗ PDF Proposed Fifth Floor Plan - LBC Proposed Floor Plans · 21 Jul 2025 View ↗ PDF Proposed First Floor Plan - LBC Proposed Floor Plans · 21 Jul 2025 View ↗ PDF Proposed Fourth Floor Plan - LBC Proposed Floor Plans · 21 Jul 2025 View ↗ PDF Proposed Roof Plan - LBC Roof Details · 21 Jul 2025 View ↗

Other documents 78

PDF Window Refurbishment Lbc 24 194 116 Other Supporting Information · 1 Jul 2026 View ↗ PDF Window Refurbishment Lbc 24 194 117 Other Supporting Information · 1 Jul 2026 View ↗ PDF Historic Element Identification 24 194 P09a Other Supporting Information · 1 Jul 2026 View ↗ PDF Historic Window Schedule 24 194 P10a Other Supporting Information · 1 Jul 2026 View ↗ PDF Proposed Roof Alterations_24-194-P08D Roof Details · 1 Jul 2026 View ↗ PDF Door And Panel Relocation 24 194 P12 Other Supporting Information · 15 Apr 2026 View ↗ PDF Emergency Lighting Installation Fifth Floor Lbc E06 Rev A Other Supporting Information · 15 Apr 2026 View ↗ PDF Emergency Lighting Installation First Floor Lbc E02 Rev A Other Supporting Information · 15 Apr 2026 View ↗ PDF Emergency Lighting Installation Fourth Floor Lbc E05 Rev A Other Supporting Information · 15 Apr 2026 View ↗ PDF Emergency Lighting Installation Ground Floor Lbc E01 Rev A Other Supporting Information · 15 Apr 2026 View ↗ PDF Emergency Lighting Installation Roof Lbc E07 Rev A Other Supporting Information · 15 Apr 2026 View ↗ PDF Emergency Lighting Installation Second Floor Lbc E03 Rev A Other Supporting Information · 15 Apr 2026 View ↗ PDF Emergency Lighting Installation Third Floor Lbc E04 Rev A Other Supporting Information · 15 Apr 2026 View ↗ PDF Ahu And Heat Recovery Installation Fifth Floor Lbc M30 Rev A Other Supporting Information · 15 Apr 2026 View ↗ PDF Ahu And Heat Recovery Installation First Floor Lbc M26 Rev A Other Supporting Information · 15 Apr 2026 View ↗ PDF Ahu And Heat Recovery Installation Fourth Floor Lbc M29 Rev A Other Supporting Information · 15 Apr 2026 View ↗ PDF Ahu And Heat Recovery Installation Ground Floor Lbc M25 Rev A Other Supporting Information · 15 Apr 2026 View ↗ PDF Ahu And Heat Recovery Installation Roof Lbc M31 Rev A Other Supporting Information · 15 Apr 2026 View ↗ PDF Ahu And Heat Recovery Installation Second Floor Lbc M27 Rev A Other Supporting Information · 15 Apr 2026 View ↗ PDF Ahu And Heat Recovery Installation Third Floor Lbc M28 Rev A Other Supporting Information · 15 Apr 2026 View ↗ PDF Fire And Security Installation Fifth Floor Lbc E20 Rev A Other Supporting Information · 15 Apr 2026 View ↗ PDF Fire And Security Installation First Floor Lbc E16 Rev A Other Supporting Information · 15 Apr 2026 View ↗ PDF Fire And Security Installation Fourth Floor Lbc E19 Rev A Other Supporting Information · 15 Apr 2026 View ↗ PDF Fire And Security Installation Ground Floor Lbc E15 Rev A Other Supporting Information · 15 Apr 2026 View ↗ PDF Fire And Security Installation Roof Lbc E21 Rev A Other Supporting Information · 15 Apr 2026 View ↗ PDF Fire And Security Installation Second Floor Lbc E17 Rev A Other Supporting Information · 15 Apr 2026 View ↗ PDF Fire And Security Installation Third Floor Lbc E18 Rev A Other Supporting Information · 15 Apr 2026 View ↗ PDF Fire Strategy Lbc 24 194 120b Other Supporting Information · 15 Apr 2026 View ↗ PDF External Doors Ex01 And Ex02 Lbc 24 194 114 Other Supporting Information · 15 Apr 2026 View ↗ PDF External Doors Ex03 And Ex04 24 194 115 Other Supporting Information · 15 Apr 2026 View ↗ PDF General Power Installation Fifth Floor Lbc E13 Rev A Other Supporting Information · 15 Apr 2026 View ↗ PDF General Power Installation First Floor Lbc E09 Rev A Other Supporting Information · 15 Apr 2026 View ↗ PDF General Power Installation Fourth Floor Lbc E12 Rev A Other Supporting Information · 15 Apr 2026 View ↗ PDF General Power Installation Ground Floor Lbc E08 Rev A Other Supporting Information · 15 Apr 2026 View ↗ PDF General Power Installation Roof Lbc E14 Rev A Other Supporting Information · 15 Apr 2026 View ↗ PDF General Power Installation Second Floor Lbc E10 Rev A Other Supporting Information · 15 Apr 2026 View ↗ PDF General Power Installation Third Floor Lbc E11 Rev A Other Supporting Information · 15 Apr 2026 View ↗ PDF Historic Element Identification 24 194 P09 Other Supporting Information · 15 Apr 2026 View ↗ PDF Historic Window Schedule 24 194 P10 Other Supporting Information · 15 Apr 2026 View ↗ PDF Mech Wiring Installation Fifth Floor Lbc E27 Rev A Other Supporting Information · 15 Apr 2026 View ↗ PDF Mech Wiring Installation First Floor Lbc E23 Rev A Other Supporting Information · 15 Apr 2026 View ↗ PDF Mech Wiring Installation Fourth Floor Lbc E26 Rev A Other Supporting Information · 15 Apr 2026 View ↗ PDF Mech Wiring Installation Ground Floor Lbc E22 Rev A Other Supporting Information · 15 Apr 2026 View ↗ PDF Mech Wiring Installation Roof Lbc E28 Rev A Other Supporting Information · 15 Apr 2026 View ↗ PDF Mech Wiring Installation Second Floor Lbc E24 Rev A Other Supporting Information · 15 Apr 2026 View ↗ PDF Mech Wiring Installation Third Floor Lbc E25 Rev A Other Supporting Information · 15 Apr 2026 View ↗ PDF General Extract And Gas Suppression Fifth Floor Lbc M24 Rev A Other Supporting Information · 15 Apr 2026 View ↗ PDF General Extract And Gas Suppression First Floor Lbc M20 Rev A Other Supporting Information · 15 Apr 2026 View ↗ PDF General Extract And Gas Suppression Fourth Floor Lbc M23 Rev A Other Supporting Information · 15 Apr 2026 View ↗ PDF General Extract And Gas Suppression Ground Floor Lbc M19 Rev A Other Supporting Information · 15 Apr 2026 View ↗ PDF General Extract And Gas Suppression Second Floor Lbc M21 Rev A Other Supporting Information · 15 Apr 2026 View ↗ PDF General Extract And Gas Suppression Third Floor Lbc M22 Rev A Other Supporting Information · 15 Apr 2026 View ↗ PDF Photographic Report Part 1 Other Supporting Information · 15 Apr 2026 View ↗ PDF Photographic Report Part 2 Other Supporting Information · 15 Apr 2026 View ↗ PDF Heating Installation Third Floor Lbc M04 Rev A Other Supporting Information · 15 Apr 2026 View ↗ PDF Plumbing Installation Fifth Floor Lbc M12 Rev A Other Supporting Information · 15 Apr 2026 View ↗ PDF Plumbing Installation First Floor Lbc M08 Rev A Other Supporting Information · 15 Apr 2026 View ↗ PDF Plumbing Installation Fourth Floor Lbc M11 Rev A Other Supporting Information · 15 Apr 2026 View ↗ PDF Plumbing Installation Ground Floor Lbc M07 Rev A Other Supporting Information · 15 Apr 2026 View ↗ PDF Plumbing Installation Second Floor Lbc M09 Rev A Other Supporting Information · 15 Apr 2026 View ↗ PDF Soils Waste And Gas Installation Fifth Floor Lbc M18 Rev A Other Supporting Information · 15 Apr 2026 View ↗ PDF Soils Waste And Gas Installation First Floor Lbc M14 Rev A Other Supporting Information · 15 Apr 2026 View ↗ PDF Soils Waste And Gas Installation Fourth Floor Lbc M17 Rev A Other Supporting Information · 15 Apr 2026 View ↗ PDF Soils Waste And Gas Installation Ground Floor Lbc M13 Rev A Other Supporting Information · 15 Apr 2026 View ↗ PDF Soils Waste And Gas Installation Second Floor Lbc M15 Rev A Other Supporting Information · 15 Apr 2026 View ↗ PDF Soils Waste And Gas Installation Third Floor Lbc M16 Rev A Other Supporting Information · 15 Apr 2026 View ↗ PDF Proposed Roof Alterations 24 194 P08c Other Supporting Information · 15 Apr 2026 View ↗ PDF Heating Installation Fifth Floor Lbc M06 Rev A Other Supporting Information · 15 Apr 2026 View ↗ PDF Heating Installation First Floor Lbc M02 Rev A Other Supporting Information · 15 Apr 2026 View ↗ PDF Heating Installation Fourth Floor Lbc M05 Rev A Other Supporting Information · 15 Apr 2026 View ↗ PDF Heating Installation Ground Floor Lbc M01 Rev A Other Supporting Information · 15 Apr 2026 View ↗ PDF Heating Installation Second Floor Lbc M03 Rev A Other Supporting Information · 15 Apr 2026 View ↗ PDF Proposed Roof Alterations_24-194-P08C Roof Details · 15 Apr 2026 View ↗ PDF Acknowledge Application Correspondence with Applicant/Agent/Solicitor · 21 Jul 2025 View ↗ PDF waste mgt report Other Supporting Information · 21 Jul 2025 View ↗ PDF Roof Proposed AHU and Heat Recovery Installation_LBC_M31 Roof Details · 21 Jul 2025 View ↗ PDF Booster Pump Set Plumbing Schematic_LBC_M33 Miscellaneous · 21 Jul 2025 View ↗ PDF Proposed Boiler House Schematic_LBC_M32 Miscellaneous · 21 Jul 2025 View ↗

All documents on the council site ↗

Work with planning data?

Every application in Belfast - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Belfast
Application type
Listed Building Consent
Postcode
BT2 8FE
Received
11 Jul 2025
Validated
11 Jul 2025
Ward
Central
Applicant
Show
Agent
Coogan & Co. Architects Ltd.

Decision outlook

Day 496, past the statutory target. 42% of listed building works in Belfast are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 17 Nov 2026.

Day 496440 days past the 56-day target
18%decided within 8 weeks
100%approved
59decided in the last year

Plota live figures for listed building works decided by Belfast in the last twelve months, from validation. Belfast decision record →

Consultation & key dates

Planning Portal ref
PP-14169378
Consultation
1 Jul 2026
Comments by
8 Aug 2025
Site or press notice
25 Jul 2025