26/01283/FUL - Full Application Awaiting decision

Proposal

Erection of an outbuilding (Retrospective). Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
7 Jul 2026
✓
Validated
5 Aug 2026
✓
Consultation
10 Aug 2026
Decision
Expected by 15 Oct 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 9 Oct 2026; it is now day 65.

The consultation period closed on 18 Sept 2026.

Site constraints 8

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Thorne - Central conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Heritage at risk: Thorne Central, Thorne
On the register of historic places assessed as at risk.
A designated building, monument, park or conservation area assessed as at risk from neglect, decay or development. Proposals that secure its future are looked on favourably.
Historic England ↗
National infrastructure project 1066 m away: Tween Bridge Solar Farm
The site is 1066 m from the project boundary. Generating station, under examination. Also within 2 km: Yorkshire and Humber CCS Cross Country Pipeline (decided, 1638 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
4 listed buildings within 150 m; Coalfield, development low risk area; Inside the Thorne built-up area; Priority habitat 35 m away: Deciduous woodland.
Not affected
Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 3

Last sold for £170,000 in November 2021. Other property, freehold.

More than one property is recorded at this address: HM Land Registry does not always give the flat or unit.

29 November 2021£170,000Recorded as a transfer outside a standard sale
16 January 2004£75,000Detached house
24 July 2003£60,000Detached house

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area158 m² (1,701 sq ft)
Energy ratingC (72 out of 100)
PropertySemi-detached house, 6 habitable rooms
Built1930 to 1949
HeatingBoiler and radiators, mains gas
WallsCavity wall, filled cavity

From the energy performance certificate lodged in July 2017, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Doncaster - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Doncaster
Application type
Full Application
Postcode
DN8 5DU
Received
7 Jul 2026
Validated
5 Aug 2026
Ward
Thorne And Moorends
Parish
Thorne Town Council
Case officer
Show
Target decision
15 Oct 2026
Applicant
Show
Agent
Watson Architecture

Decision outlook

Day 65, past the statutory target. 95% of extensions in Doncaster are decided within thirteen weeks, which runs to 4 Nov 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 7 Oct 2026.

Day 659 days past the 56-day target
83%decided within 8 weeks
92%approved
436decided in the last year

Plota live figures for extensions decided by Doncaster in the last twelve months, from validation. Doncaster decision record →

Public comments

No public comments yet.

4 neighbours consulted · Last counted 7 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15065645
Planning Portal ref
PP-15065645
Neighbours
7 Aug 2026
Consultation
10 Aug 2026
Comments by
18 Sept 2026
Site or press notice
28 Aug 2026
Statutory expiry
30 Sept 2026
Env. assessment
No
Doncaster
Planning Authority Score
7.7/10
Good
#36 of 296 councils
Relevant to this application:
Householder decisions

Doncaster is one of the fastest councils in England for householder decisions, ranking #27 out of 296. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Doncaster decision statistics
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #169 of 296
94%
Householder approved
Above avg (90%) #103 of 296
83%
Decided in 8 weeks
Above avg (63%) #27 of 296
33%
Extended time limit
Below avg (41%) #75 of 296
67%
Minor dwellings approved
135 decided (1-9 homes)
93%
Major dwellings approved
27 decided (10+ homes)
90%
Change of use approved
48 decided
928
Total decisions
122 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.