Homer 96 Stockbridge Road Donnington Chichester West Sussex PO19 8QP Data via plota.co.uk

25/01535/PLD - Proposed Lawful Development Approved

Proposal

Proposed lawful development - erection of 1 no. outbuilding/office on an existing concrete slab Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
27 Jun 2025
✓
Validated
7 Jul 2025
✓
Consultation
15 Jul 2025
✓
Approved
18 Aug 2025

Approved on 18 Aug 2025 · Delegated Decision · Last checked 14 Oct 2026

Site constraints 3

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Also on the record
Radon affected area, class 3; Inside the Chichester built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 1 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area132 m² (1,421 sq ft)
Energy ratingC (69 out of 100)
PropertyEnd-terrace house, 7 habitable rooms
Built1900 to 1929
HeatingBoiler and radiators, mains gas
WallsCavity wall, filled cavity

From the energy performance certificate lodged in September 2022, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in Chichester - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Chichester
Application type
Proposed Lawful Development
Postcode
PO19 8QP
Received
27 Jun 2025
Validated
7 Jul 2025
Ward
Harbour Villages
Parish
Donnington
Case officer
Show
Target decision
1 Sept 2025
Decision
PERMIT
Decision date
18 Aug 2025
Decision level
Delegated Decision
Applicant
Show

How this decision compares

Decided in 42 days from validation, 9 days faster than Chichester's median of 51 for lawful development certificates. Approved, as 86% of lawful development certificates here are.

96%decided within 8 weeks
86%approved
105decided in the last year

Plota live figures for lawful development certificates decided by Chichester in the last twelve months, from validation. Chichester decision record →

Public comments

No public comments yet.

Last counted 14 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14132080
Planning Portal ref
PP-14132080
Consultation
15 Jul 2025
Statutory expiry
1 Sept 2025
Env. assessment
No
Chichester
Planning Authority Score
8.9/10
Excellent
#6 of 296 overall
Relevant to this application:
Householder decisions

Chichester is one of the fastest councils in England for householder decisions: #10 of 296 on speed. Only 18% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Chichester decision statistics
Based on MHCLG data, the year to March 2026
89%
Overall approval rate
Above avg (87%) #127 of 296
95%
Householder approved
Above avg (90%) #72 of 296
93%
Decided in 8 weeks
Above avg (63%) #10 of 296
18%
Extended time limit
Below avg (41%) #15 of 296
68%
Minor dwellings approved
110 decided (1-9 homes)
76%
Major dwellings approved
17 decided (10+ homes)
74%
Change of use approved
34 decided
935
Total decisions
107 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.