Hazardous waste treatment facility at Land North Of Energy Park Way, Grimsby
Summary of planning committee decision
Decided by North East Lincs Planning Committee on 25 Feb 2026.
What was proposed
The application proposed a hazardous waste treatment facility using high-temperature thermal processing and energy recovery, with a 47-metre flue and associated infrastructure.
“PROPOSAL: Construction of a waste treatment facility (hazardous waste treated by high temperature thermal processing and energy recovery) to include 47m (approximately) high flue with ancillary related development including associated access, infrastructure, landscaping and raising of ground levels.”
“This Environmental Impact Assessment (EIA) application seeks permission to erect a waste treatment facility for specialist commercial, industrial and medical waste classified as hazardous waste. The facility would treat waste through high temperature (1000+ degrees) thermal treatment and would process around 25,000 tonnes per annum.”
Officer report
The site and surroundings
The 8.8-hectare site formed part of a former industrial complex, was divided into two plots, and lay in Flood Zone 3 near protected estuary sites.
“The application site, located on part of the former Courtaulds (Accordis) site off Energy Park Way and has an area of 8.8ha. As noted above the site is divided into two parts, the larger part, known as Plot I, is 7.05ha whilst the smaller part, Plot C, is 1.68ha.”
“Old Fleet Drain forms the northern boundary to the site at Plot I, and beyond this is an agricultural field. Part of this field is allocated within the NELLP as Managed Mitigation land and part Employment land. The field is known to be functionally linked (land) with the estuary through its use by protected bird species particularly at high tide. To the north east of Plot I, the land appears as raised open scrub land but is actually a former landfill site.”
Officer report
Earlier permissions
Earlier permissions included an estate road and access bridge, industrial developments, waste facilities, a tyre pyrolysis plant and energy-from-waste schemes.
“DM/0850/21/FUL Erect waste water treatment plant with associated access, plant and equipment, install site office, car parking and temporary access with parking and contractors compound, Lenzing Energy Park Way, Grimsby as amended by DM/0258/24/NMA. Approved August 2023.”
“DM/0667/20/FUL Variation of Condition 22 (approved plans) attached to planning permission DM/0329/18/FUL (Erection of industrial building and adjoined two storey office/control room to create power plant (18MW Energy From Waste) including construction of associated access, hard surfacing, erection of 65m chimney stack and installation of necessary plant and machinery) - for alterations to main building including increase width of gasification train hall, increase width and…”
Officer report
Consultation responses
Consultees generally supported the proposal or raised no objection, subject to conditions covering traffic, ecology, drainage, contamination, construction and aviation safety.
“Environment Agency: Originally raised a number of concerns with respect to the scheme, in particular the specific contaminates, contamination of water course, stability of the landfill, surface water drainage, piling, landfill gas and controlled waters assessment. Following the submission of additional information, conditions are recommended and no further objections raised with respect to the drainage strategy.”
“Environmental Protection: Do not object and note that the Environmental Permit process would be suitable to ensure the impacts on the environment and human health are adequately assessed and protected. Require conditions into relation to construction hours, construction management, contamination assessment, remediation (including long term monitoring of remediation).”
Officer report
Views from neighbours and others
No neighbours objected, while RWE supported the facility in principle but sought safeguards for its adjoining site and related environmental and operational risks.
“RWE: Supports the waste treatment facility in principle but RWE seeks any decision and conditions to protect its interests on the adjoining site and any future development of that area. The potential disturbance to the landfill needs to be managed to ensure no leaching into Old Fleet Drain occurs. Also notes no 'in combination assessment' with the RWE project in terms of emissions.”
Officer report
Main planning issues
The assessment considered the principle of development, ecology, amenity, health and safety, flooding, contamination, highways, parking, design, character and heritage.
“1) Principle of development 2) Ecology, BNG and landscaping 3) Amenity, health and safety 4) Flood risk and drainage 5) Contamination 6) Highway safety and parking 7) Design, character and heritage…”
Officer report
The decision
“Decision: Approved with Conditions Condition The development hereby permitted shall begin within three years of the date of this permission. Reason To comply with S.91 of the Town and Country Planning Act 1990. 1 2 Condition The development shall not be carried out except in complete accordance with the approved plans and specifications. The approved plans and reports are as follows: Plans G026-01 V11A Humber Gate Grimsby - 1:2500 Site Location Plan 24003-HL-ZZ-ZZ-DR-A-1002-S2-P05 Proposed Site Location Plan 24003-HL-ZZ-ZZ-DR-A-1003-S2-P01 Site Plan - Existing showing Top and OS Data 24003-HL-ZZ-ZZ-DR-A-1610-S2-P02 Site Plan - Proposed Showing Roofs Orientated True North 24003-HL-ZZ-ZZ-DR-A-1611-S2-P02 Site Plan - Proposed Showing Ground Level Orientated True North 2”
Minutes, 25 Feb 2026
Councillors at the meeting
- David Anthony HasthorpeChairConservativeFor(no vote against recorded)
- Paul Christopher BrightIndependentFor(no vote against recorded)
- Loyd Layton EmmersonLib DemFor(no vote against recorded)
- Henry HudsonConservativeFor(no vote against recorded)
- Dan HumphreyLabourFor(no vote against recorded)
- Edward Thomas Peter KaczmarekLabourFor(no vote against recorded)
- Tim MickleburghLabourFor(no vote against recorded)
- Kevin ShuttLabourFor(no vote against recorded)
- Hayden Alexander DawkinsSubstitute for PettigrewConservativeFor(no vote against recorded)
- Paul SilvesterSubstitute for LindleyConservativeFor(no vote against recorded)
The minutes record this decision with no vote against, so each member present for this item is shown as voting for it.
Apologies Ian Robert Lindley Conservative, Nick Pettigrew Conservative
Source: Plota analysis of the council's minutes; parties from Democracy Club.
Sources
- North East Lincs Planning Committee minutes, 25 February 2026
- Agenda and papers (council website)
Source: Plota analysis of North East Lincs's committee minutes and officer report. Quotations are the council's own words; headings and summaries are Plota's.
Committee decisions and nationwide planning applications, in one API
The Plota API returns planning applications from every council we cover, each with its decision, whether a committee or officers decided it, and the committee date. Build it into your own tools.
See the API →At the meeting
- Committee
- North East Lincs Planning Committee
- Council
- North East Lincs
- Date
- Wednesday 25 February 2026
- Recommendation
- Officers recommended approval
- Committee decided
- Approved
- Councillors
- 10Conservative 4Labour 4Independent 1Lib Dem 1Show votes
- Minutes
- The council's minutes
- Meeting
- Agenda and papers (council website)
- Application
- View application →
- All decisions
- North East Lincs committee decisions →
This committee's year
29 decisions in the 12 months to this meeting, 1 against officer advice.
Source: Plota analysis of the committee's minutes.