30B The Riverwalk Millburngate Durham DH1 4SL Data via plota.co.uk

DM/25/03554/AD - Advertisement Consent Approved

Proposal

New illuminated signage to the front of the building Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
19 Dec 2025
✓
Validated
5 Jan 2026
✓
Consultation
15 Jan 2026
✓
Approved
18 Feb 2026

Approved on 18 Feb 2026 · Advertisement · Last checked 24 Sept 2026

Licence at this address

  • Licence Buffet King Premises licence · in force Hours not given on the register

Licensed hours are what the licence permits, not opening times.

Site constraints 10

Grade II listed: Old Toms
List entry 1310686 · 28 m away · 9 more listed buildings within 150 m (3 Grade I, 6 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 9 with distances
Historic England ↗
Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Public footpath 4 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Durham City conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Scheduled monument 35 m away: Framwellgate Bridge
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
World heritage site 102 m away: Durham Castle and Cathedral
Its setting is a consideration for work nearby.
Registered parks and gardens, battlefields, world heritage sites and protected wrecks are designated heritage assets: harm needs clear and convincing justification.
Historic England ↗
Also on the record
Radon affected area, class 2; Flood defence 6 m away (natural high ground, designed for a 1 in 2 year flood); Coalfield, development low risk area; Inside the Durham built-up area.
Not affected
Not green belt

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area587 m² (6,318 sq ft)
Energy ratingB (asset rating 37)
UseRestaurants and Cafes/Drinking Establishments/Takeaways
HeatingAir Conditioning

From the energy performance certificate lodged in September 2022, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Durham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Durham
Application type
Advertisement Consent
Postcode
DH1 4SL
Received
19 Dec 2025
Validated
5 Jan 2026
Ward
Elvet, Gilesgate And Shincliffe
Parish
City Of Durham
Case officer
Show
Target decision
2 Mar 2026
Decision
Approved
Decision date
18 Feb 2026
Decision level
Advertisement
Applicant
Show
Agent
Capture Interior Architecture

How this decision compares

Decided in 44 days from validation, 11 days faster than Durham's median of 55 for signs and adverts. Approved, as 91% of signs and adverts here are.

73%decided within 8 weeks
91%approved
174decided in the last year

Plota live figures for signs and adverts decided by Durham in the last twelve months, from validation. Durham decision record →

Public comments

No public comments yet.

13 neighbours consulted · Last counted 24 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14579598
Planning Portal ref
PP-14579598
Neighbours
6 Jan 2026
Consultation
15 Jan 2026
Comments by
10 Feb 2026
Site or press notice
20 Jan 2026
Statutory expiry
2 Mar 2026
Env. assessment
No
Durham
Planning Authority Score
5.2/10
Average
#137 of 296 overall
Relevant to this application:
Other decisions

Durham is #190 of 296 councils on householder decision speed. 48% of applications have the time limit extended, above the 41% national average. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Durham decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #52 of 296
97%
Householder approved
Above avg (90%) #29 of 296
59%
Decided in 8 weeks
Below avg (63%) #190 of 296
48%
Extended time limit
Above avg (41%) #213 of 296
79%
Minor dwellings approved
95 decided (1-9 homes)
90%
Major dwellings approved
49 decided (10+ homes)
87%
Change of use approved
201 decided
1,706
Total decisions
113 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.