52 Stony Hill Avenue, Blackpool, FY4 1PR Data via plota.co.uk

Decided 25/0106
Date received
20 Feb 2025
Date validated
20 Feb 2025
Postcode
FY4 1PR

Description

Erection of a single storey rear extension, hip to gable roof enlargement, rear dormer and provis... Data via plota.co.uk

Last checked

Site constraints 4

Article 4 direction
Article 4 Direction - C3 to C4 HMO. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
National infrastructure project 528 m away: Morgan and Morecambe Offshore Wind Farms Transmission Assets
The site is 528 m from the project boundary. Electricity line, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Blackpool built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 1 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 1

Last sold for £205,000 in January 2025. Semi-detached house, freehold.

10 January 2025£205,000

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area110 m² (1,184 sq ft)
Energy ratingD (65 out of 100), could reach C
PropertySemi-detached house, 6 habitable rooms
Built1900 to 1929
HeatingBoiler and radiators, mains gas
WallsCavity wall, filled cavity

From the energy performance certificate lodged in June 2024, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Blackpool - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service
Blackpool
Planning Authority Score
3.8/10
Below average
#204 of 296 overall
Relevant to this application:
Householder decisions

Blackpool is #101 of 296 councils on householder decision speed. Blackpool is also one of the strictest councils - it refuses more householder applications than almost any other, with only 78% approved vs 90% nationally.

One of the strictest councils
only 78% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Blackpool decision statistics
Based on MHCLG data, the year to March 2026
83%
Overall approval rate
Below avg (87%) #232 of 296
78%
Householder approved
Below avg (90%) #285 of 296
72%
Decided in 8 weeks
Above avg (63%) #101 of 296
43%
Extended time limit
Above avg (41%) #169 of 296
58%
Minor dwellings approved
19 decided (1-9 homes)
100%
Major dwellings approved
2 decided (10+ homes)
83%
Change of use approved
41 decided
351
Total decisions
60 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.