Barn and land east of Hamilton Barn, Northfield Lane, Long Wittenham, Oxfordshire Data via plota.co.uk

P26/S4677/FUL - Full Application Consultation Period

Proposal

Phased development. 1 removal of existing building. 2 formation of access and parking/turning area. 3 Construction of new dwelling with garden and associated works. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
13 Oct 2026
✓
Validated
27 Oct 2026
Decision
Expected by 22 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 21 Dec 2026 and 29 Dec 2026, from South Oxfordshire's recent demolitions.

Comments are open until 26 Nov 2026

Comment on this application ↗

Site constraints 6

Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Public footpath about 26 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Conservation area about 12 m away: Long Wittenham Conservation Area
The edge of the area; work outside it can still affect its setting.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Also on the record
4 listed buildings within 150 m of the postcode pin; Inside the Long Wittenham built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 2, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 1 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in South Oxfordshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Application
Received
13 Oct 2026
Validated
27 Oct 2026
Target decision
22 Dec 2026
Applicant
Show
Agent
John Phillips Planning Consultancy

Decision outlook

Day 27 of the 56-day target. South Oxfordshire usually decides demolitions by day 56.

Day 2729 days to the 56-day target
51%decided within 8 weeks
95%approved
137decided in the last year

Plota live figures for demolitions decided by South Oxfordshire in the last twelve months, from validation. South Oxfordshire decision record →

Public comments

No public comments yet.

Last counted 17 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Consultation
29 Oct 2026
Comments by
26 Nov 2026
Statutory expiry
22 Dec 2026
South Oxfordshire
Planning Authority Score
7.6/10
Good
#39 of 296 overall
Relevant to this application:
Householder decisions

South Oxfordshire is faster than most councils at deciding householder applications: #89 of 296 on speed. Householder applications are more likely to be approved here than most councils, with a 98% approval rate vs 90% nationally.

More permissive than most councils
98% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
South Oxfordshire decision statistics
Based on MHCLG data, the year to March 2026
94%
Overall approval rate
Above avg (87%) #47 of 296
98%
Householder approved
Above avg (90%) #23 of 296
74%
Decided in 8 weeks
Above avg (63%) #89 of 296
35%
Extended time limit
Below avg (41%) #105 of 296
83%
Minor dwellings approved
163 decided (1-9 homes)
56%
Major dwellings approved
27 decided (10+ homes)
92%
Change of use approved
26 decided
1,529
Total decisions
96 refused in the year to March 2026