Outside Waitrose London Road, Twickenham Data via plota.co.uk

PA26/3738 - Full Application Registered

Proposal

Installation of a Street Hub 3 Unit Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
2 Nov 2026
✓
Validated
17 Nov 2026
✓
Consultation
27 Nov 2026
Decision
Expected by 12 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision between 31 Dec 2026 and 7 Jan 2027, from Richmond upon Thames's recent utility and infrastructure works.

Comments are open until 18 Dec 2026

Comment on this application ↗

Site constraints 8

Air quality management area: Richmond AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: Twickenham
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
Also on the record
Conservation area 42 m away: Queen's Road (Twickenham); National infrastructure project 202 m away: Expansion of Heathrow Airport (Third Runway), at pre-application; 1 listed building within 150 m; Inside the Richmond upon Thames built-up area; Public transport access: PTAL 4 (good), TfL 2023, for the 100 m square; Designated open space 19 m away.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 18 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Richmond upon Thames - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Application
Received
2 Nov 2026
Validated
17 Nov 2026
Ward
Twickenham Riverside Ward [TRW]
Case officer
Show
Target decision
12 Jan 2027
Applicant
Show
Agent
Dalcour Maclaren

Decision outlook

Day 6 of the 56-day target. Richmond upon Thames usually decides utility and infrastructure works by day 49.

Day 650 days to the 56-day target
77%decided within 8 weeks
90%approved
97decided in the last year

Plota live figures for utility and infrastructure works decided by Richmond upon Thames in the last twelve months, from validation. Richmond upon Thames decision record →

Consultation & key dates

Alt. reference
PP-15335056
Comments by
18 Dec 2026
Site or press notice
27 Nov 2026
Statutory expiry
8 Dec 2026
Richmond upon Thames
Planning Authority Score
4.4/10
Below average
#182 of 296 overall
Relevant to this application:
Householder decisions

Richmond upon Thames is #130 of 296 councils on householder decision speed. Richmond upon Thames is also one of the strictest councils - it refuses more householder applications than almost any other, with only 82% approved vs 90% nationally.

One of the strictest councils
only 82% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Richmond upon Thames decision statistics
Based on MHCLG data, the year to March 2026
81%
Overall approval rate
Below avg (87%) #257 of 296
82%
Householder approved
Below avg (90%) #268 of 296
69%
Decided in 8 weeks
Above avg (63%) #130 of 296
35%
Extended time limit
Below avg (41%) #104 of 296
68%
Minor dwellings approved
181 decided (1-9 homes)
100%
Major dwellings approved
3 decided (10+ homes)
47%
Change of use approved
17 decided
1,888
Total decisions
358 refused in the year to March 2026