Land of 35 Carrington Lane, Milford-on-Sea SO41 0RA Data via plota.co.uk

26/10765 - Full Planning Permission Registered

Proposal

Sever land, erect 1 No 3 bedroom bungalow with access from Smugglers Way. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
10 Aug 2026
✓
Validated
11 Aug 2026
✓
Consultation
13 Aug 2026
Decision
Expected by 6 Oct 2026

Under consideration

No decision has been issued yet. Plota predicts a decision by 18 Oct 2026, from New Forest (District)'s recent new homes.

The consultation period closed on 11 Sept 2026.

Site constraints 9

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Article 4 direction
Hovercraft in the Solent. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Special protection area 284 m away: Solent & Southampton Water
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Also on the record
SSSI 284 m away: North Solent SSSI; Radon affected area, class 3; 1 listed building within 150 m; National infrastructure project 1689 m away: Navitus Bay Wind Park; Inside the Milford on Sea built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in New Forest (District) - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Postcode
SO41 0RA
Received
10 Aug 2026
Validated
11 Aug 2026
Ward
Milford & Hordle
Parish
Milford-On-Sea
Case officer
Show
Target decision
6 Oct 2026
Applicant
Show
Agent
ARC Architects Ltd

Decision outlook

Day 59 of the 56-day target. New Forest (District) usually decides new homes by day 64.

Day 595 days to the predicted decision (day 64)
43%decided within 8 weeks
50%approved
47decided in the last year

Plota live figures for new homes decided by New Forest (District) in the last twelve months, from validation. New Forest (District) decision record →

Public comments

3comments received
3 objecting

100% object · above the UK average of 74%

27 neighbours consulted · Last counted 8 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15106009
Planning Portal ref
PP-15106009
Consultation
13 Aug 2026
Comments by
11 Sept 2026
Env. assessment
No
New Forest (District)
Planning Authority Score
7.8/10
Good
#29 of 296 councils
Relevant to this application:
Householder decisions

New Forest (District) is faster than most councils at deciding householder applications, ranking #37 out of 296. Householder applications are slightly more likely to be approved here (96%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
New Forest (District) decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #112 of 296
96%
Householder approved
Above avg (90%) #54 of 296
80%
Decided in 8 weeks
Above avg (63%) #37 of 296
35%
Extended time limit
Below avg (41%) #103 of 296
69%
Minor dwellings approved
87 decided (1-9 homes)
91%
Major dwellings approved
11 decided (10+ homes)
78%
Change of use approved
40 decided
885
Total decisions
85 refused in the year to March 2026