Land Intersecting The B4102 Meriden Road And The River Blythe, To The North Of Patrick Farm Data via plota.co.uk

PL/2026/01818/HS2DIS - HS2 Section 17 (DIS) Awaiting decision

Proposal

Plans and Specifications submission under Schedule 17 to the High Speed Rail (London - West Midlands) Act 2017 for works comprising: Structures - Provision of a ditch crossing slab around the northern end of Patrick Cutting and Embankment (both consented separately - SMBC planning reference: ); earthworks - Engineering earthworks to form the toe of two adjoining embankments; engineering earthworks to form a maintenance access strip (MAS), a maintenance access track (MAT) and associated ford crossing at northern end of the River Blythe Viaduct (consented separately - SMBC planning reference: ); engineering earthworks to form drainage ditches, including a drainage ditch incorporating a concrete drop-inlet cascade around the northern end of Patrick Cutting and Embankment (both consented separately - planning reference: ), extending beneath the southern extent of the River Blythe Viaduct (consented separately - SMBC planning reference: ); earthworks to create part of a layby, partially consented under Patrick Cutting and Embankment (both consented separately - SMBC reference: ); fences and walls - Provision of Vehicle Restraint Systems (VRS), located south of the River Blythe Viaduct (consented separately - SMBC planning reference: ); provision of boundary and security fencing with access gates. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
5 Oct 2026
✓
Consultation
8 Oct 2026
Decision
Expected by 30 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 29 Nov 2026 and 14 Dec 2026, from Solihull's recent utility and infrastructure works.

The consultation period closed on 29 Oct 2026.

Associated applications 4

  • Part of

    Approvedcouncil archive
  • Also linked at this site · 1
    • Conditionsarchive

Site constraints 6

Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
2 listed buildings within 150 m; National infrastructure project 1.2 km away: M42 Junction 6 Improvement; Inside the Hampton in Arden built-up area; Green belt 74 m away: Birmingham; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Solihull - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Solihull
Application type
HS2 Section 17 (DIS)
Received
5 Oct 2026
Validated
5 Oct 2026
Ward
Meriden & Arden
Parish
Hampton In Arden Parish Council
Target decision
30 Nov 2026
Applicant
Show
Agent
Balfour Beatty Vinci (BBV)

Decision outlook

Day 49 of the 56-day target. Solihull usually decides utility and infrastructure works by day 56.

Day 497 days to the 56-day target
54%decided within 8 weeks
100%approved
27decided in the last year

Plota live figures for utility and infrastructure works decided by Solihull in the last twelve months, from validation. Solihull decision record →

Consultation & key dates

Consultation
8 Oct 2026
Comments by
29 Oct 2026
Statutory expiry
30 Nov 2026
Env. assessment
No
Solihull
Planning Authority Score
5.2/10
Average
#141 of 296 overall
Relevant to this application:
Householder decisions

Solihull is #148 of 296 councils on householder decision speed. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Solihull decision statistics
Based on MHCLG data, the year to March 2026
94%
Overall approval rate
Above avg (87%) #44 of 296
94%
Householder approved
Above avg (90%) #116 of 296
65%
Decided in 8 weeks
Above avg (63%) #148 of 296
41%
Extended time limit
Below avg (41%) #160 of 296
87%
Minor dwellings approved
53 decided (1-9 homes)
88%
Major dwellings approved
8 decided (10+ homes)
90%
Change of use approved
51 decided
1,118
Total decisions
71 refused in the year to March 2026